Energy Projects Near You

Solar, wind and battery projects near Belfast (BT5)

8 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of BT5 (Belfast): 2 are waiting for a planning decision, 2 approved but not yet running, 1 operational. The largest live scheme is Lisnabreeny Road (36 MW battery storage, approved on 21 June 2019, not yet built; REPD status may be out of date), 3.7 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8projects within 10 km
2awaiting a decision
2approved, not running
1operational

Projects within 10 km of BT5

Projects of 1 MW and more (5)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Lisnabreeny Roadbattery storagebattery storage36approved, not built may be out of dateupdated Jun 2020Jun 2019granted Jun 2019Jun 2020Lisburn and Castlereagh3.7
Solar PV Energy Alterations in Belfastsolar farmsolar farm2application submitted may be out of dateupdated Jun 2024Apr 2024—Jun 2024Belfast3.9
Development SE of Flush Roadwind turbinewind turbine2permission expiredupdated Aug 2020Jan 2015granted Nov 2015Aug 2020Belfast9.5
Bombardier Factoryrooftop solarrooftop solar3.8operationalupdated Jun 2015Nov 2013granted Feb 2014Jun 2015Antrim and Newtownabbey10.0
320mts South East of 43 Flush Roadwind turbinewind turbine2permission expiredupdated Aug 2020Nov 2014granted Nov 2015Aug 2020Belfast10.0
Smaller schemes under 1 MW, mostly rooftop solar (3)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Tullyhubbert Roadwind turbinewind turbine—application submitted may be out of dateupdated Sep 2024Jul 2024—Sep 2024Ards and North Down8.1
Ballynahinch Roadwind turbinewind turbine0.2approved, not builtupdated Feb 2021Oct 2020granted Sep 2021Feb 2021Lisburn and Castlereagh8.8
Upper Hightown Roadwind turbinewind turbine0.2refusedupdated Mar 2023Mar 2020refused Jan 2023Mar 2023Belfast9.1

Distance from the average position of the BT5 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm110002
Rooftop solar100100
Wind turbine511010.2
Battery storage1010036

MW in pipeline: pending, approved and under-construction capacity.

How Belfast decides solar, wind and battery applications

Belfast has 5 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

All projects in Belfast

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near BT5, 3 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.