Bedhampton Pumping Station, Meyrick Road (150 MW battery storage)
Bedhampton Pumping Station, Meyrick Road is a 150 MW battery storage project in Havant, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 1 May 2025, no decision recorded; the record was last updated on 1 July 2025.
150 MWbattery storage
application submittedstatus in REPD
1 July 2025record last updated
Havantcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 1 May 2025 | Application submitted |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 150 MW
- Status (REPD)
- application submitted
- Record last updated
- 1 July 2025
- Operator or applicant
- E101 Hub 4 Limited
- Planning authority
- Havant
- Planning application reference
- APP/25/00351
- Address (REPD)
- Bedhampton Pumping Station, Meyrick Road
- Council area (by location)
- Havant
- Name in REPD
- Bedhampton Pumping Station, Meyrick Road - Battery Energy Storage
- REPD reference
- 18986
Who decides
Havant has 2 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Fort Widley, Portsdown Hill Road | battery storage | 120 | application submitted | 5.9 |
| Lovedean, Denmead Solar farm & Battery storage | solar farm | 49.9 | application submitted | 7.9 |
| Southwick Estate | solar farm | 48 | operational | 8.0 |
| Lovedean Lane | battery storage | 50 | refused | 8.0 |
| Lovedean Substation | battery storage | 49.9 | application withdrawn | 8.6 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.8531, -0.9784).