Lovedean, Denmead Solar farm & Battery storage (49.9 MW)

Lovedean, Denmead Solar farm & Battery storage is a 49.9 MW solar farm project in East Hampshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 11 March 2022, no decision recorded; the record was last updated on 24 March 2022. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
application submittedmay be out of datestatus in REPD
24 March 2022record last updated
East Hampshirecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
11 March 2022Application submitted

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
application submitted
Record last updated
24 March 2022
Operator or applicant
Lovedean Green Limited
Planning authority
East Hampshire
Planning application reference
58038/003
Site area
92.0 ha
Address (REPD)
S/O Lovedean Electricity Sub Station, Broadway Lane, Lovedean, Waterlooville
Council area (by location)
East Hampshire
Name in REPD
Lovedean, Denmead - Solar farm & Battery storage
REPD reference
9257

The scheme also includes battery storage, recorded separately in REPD (application submitted).

Earlier applications for this site

ApplicationMWSubmittedOutcome
Lovedean Energy Storage System 57524/00149.929 September 2017refused 2 October 2018

Who decides

ApplicationsEast HampshireUK
Decided applications (solar, wind, battery)1910,236
Refused4 (21%)19%
Solar refused2 of 1612%
Battery storage refused2 of 316%
Median time from submission to decision13.0 weeks17.0 weeks
Appeals lodged / allowed0 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Lovedean Substationbattery storage49.9application withdrawn0.8
Lovedean Lanebattery storage50refused1.5
Southwick Estatesolar farm48operational4.5
Fort Widley, Portsdown Hill Roadbattery storage120application submitted6.9
Bedhampton Pumping Station, Meyrick Roadbattery storage150application submitted7.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.9138, -1.0375).