Huncoat Power Station (45 MW battery storage)

Huncoat Power Station is a 45 MW battery storage project in Burnley, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 31 October 2024; the record was last updated on 26 November 2024.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

45 MWbattery storage
refusedstatus in REPD
26 November 2024record last updated
Burnleycouncil area

Planning timeline

DateStage
28 December 2023Application submitted
31 October 2024Refused by the planning authority

Project details

Technology
battery storage (stand-alone storage)
Capacity
45 MW
Status (REPD)
refused
Record last updated
26 November 2024
Operator or applicant
Newgen Limited
Planning authority
Burnley
Planning application reference
FUL/2023/0785
Address (REPD)
W/O The A56 & To The South W/O Jnct 8 Of The M65, E/O The The Former Huncoat Power Station, Burnley
Council area (by location)
Burnley
Time to decision
44 weeks
Name in REPD
Huncoat Power Station - Battery Storage Facility
REPD reference
15712

Earlier applications for this site

ApplicationMWSubmittedOutcome
Huncoat Power Station FUL/2021/06015019 October 2021replaced by a revised application
Huncoat Power Station FUL/2022/0729455 January 2023withdrawn 15 December 2023

Who decides

ApplicationsBurnleyUK
Decided applications (solar, wind, battery)1710,236
Refused7 (41%)19%
Solar refused0 of 312%
Onshore wind refused4 of 845%
Battery storage refused3 of 616%
Median time from submission to decision24.7 weeks17.0 weeks
Appeals lodged / allowed0 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Shuttleworth House, Higher Shuttleworthbattery storage100refused0.8
Hameldon Hill extensionwind farm7.5operational1.7
Calder Works, Burnley Roadbattery storage70application withdrawn2.3
Padihambattery storage99.9refused2.3
Hameldon Hill Wind Farm (extension 2)wind farm7.1permission expired3.3
White Hillwind farm12refused6.2
Ramsclough Farm, Haslingden Old Road Solar Farmsolar farm26.4application submitted6.6
The Old Vicarage, Reedleybattery storage100approved, not built6.8
Knuzden Moss Farm, Oswaldtwistlebattery storage60approved, not built7.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7772, -2.3305).