Solar Panels at Hedgehog Grove Solar Farm (98 MW)

Solar Panels at Hedgehog Grove Solar Farm is a 98 MW solar farm project in Tower Hamlets, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 24 March 2026, no decision recorded; the record was last updated on 17 April 2026. As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (26/00440/FUL).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

98 MWsolar farm
application submittedstatus in REPD
17 April 2026record last updated
Tower Hamletscouncil area

Planning timeline

DateStage
24 March 2026Application submitted

Project details

Technology
solar farm
Capacity
98 MW
Status (REPD)
application submitted
Record last updated
17 April 2026
Operator or applicant
Totalenergies Renewables Uk Limited (Hedgehog Grove Solar Farm)
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
26/00440/FUL
Site area
255.0 ha
Address (REPD)
Hedgehog Grove Solar Farm, S/O The A120 Between Bannister Green And Bartholomew Green
Council area (by location)
Tower Hamlets
Name in REPD
Hedgehog Grove Solar Farm - Solar Panels
REPD reference
18870

Who decides

As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (26/00440/FUL). All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Atcost Roadbattery storage100application submitted8.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.5024, -0.0181).