The Old Airfield Solar Farm (49 MW)

The Old Airfield Solar Farm is a 49 MW solar farm project in Shropshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 9 March 2023, not yet built; the record was last updated on 30 June 2026. REPD also records that the planning permission expired on 9 March 2026, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49 MWsolar farm
approved, not builtmay be out of datestatus in REPD
30 June 2026record last updated
Shropshirecouncil area

REPD also records that the planning permission expired on 9 March 2026, so the project may not go ahead in this form.

Planning timeline

DateStage
17 May 2022Application submitted
9 March 2023Planning permission granted
9 March 2026Permission expired

Project details

Technology
solar farm
Capacity
49 MW
Status (REPD)
approved, not built
Record last updated
30 June 2026
Operator or applicant
Peridot Solar Limited
Planning authority
Shropshire
Planning application reference
22/01866/FUL
Site area
52.5 ha
Address (REPD)
The Old Airfield Site Eaton Upon Tern Market Drayton
Council area (by location)
Shropshire
Time to decision
42 weeks
Name in REPD
The Old Airfield - Solar Farm
REPD reference
8525

Who decides

ApplicationsShropshireUK
Decided applications (solar, wind, battery)9810,236
Refused22 (22%)19%
Solar refused20 of 7812%
Onshore wind refused2 of 345%
Battery storage refused0 of 1716%
Median time from submission to decision15.2 weeks17.0 weeks
Appeals lodged / allowed10 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
High Ercall Solar Farmsolar farm49.9approved, not built6.5
Twitch Hill, Cheswell Grange Farm Solar Farm & Battery Storagesolar farm25under construction8.8
Rushmoor Lane Farm (Cheshire Coppice)solar farm5operational9.0
Hollins Lanebattery storage13approved, not built9.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.8046, -2.5145).