Whitestone Solar Farm (750 MW)

Whitestone Solar Farm is a 750 MW solar farm project in Rotherham, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 3 July 2026, no decision recorded; the record was last updated on 14 July 2026. As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN0110020).

How it works ↓

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

750 MWsolar farm
application submittedstatus in REPD
14 July 2026record last updated
Rotherhamcouncil area

Planning timeline

DateStage
3 July 2026Application submitted

Project details

Technology
solar farm
Capacity
750 MW
Status (REPD)
application submitted
Record last updated
14 July 2026
Operator or applicant
Net Zero One Ltd
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
EN0110020
Site area
1,488.0 ha
Address (REPD)
3 Separate Sites, Rotherham
Council area (by location)
Rotherham
REPD reference
17699

The scheme also includes battery storage, recorded separately in REPD (application submitted).

Whitestone is the newest large solar application in the July 2026 REPD extract: Net Zero One Ltd submitted it on 3 July 2026, and by 14 July 2026 the record had already been updated. The 750 MW solar farm is designed for 1,488 hectares, split into three separate sites across Rotherham. Where exactly those sites run, the data does not show: the register holds a single point for the whole project, and the mini-map displays only that.

Who will decide

As a nationally significant infrastructure project, Whitestone will go through examination by the Planning Inspectorate, and the decision (DCO) will be taken by the Energy Secretary. The inspectorate's median is 73 weeks from application to decision; whatever is decided after the extract, the site will not show it. The scheme's battery storage is recorded as a separate application.

What else is nearby

Within 10 km of the point there are 12 postcode districts of Rotherham and Sheffield, among them S60. At the same point there is a separate application for Maltby Solar Farm at 20 MW. The Moat Lane batteries in Wickersley (100 MW) and Green Lane in Thurcroft (85 MW) are approved, not built.

Who decides

As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN0110020). All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Maltby Solar Farmsolar farm20application submitted<0.1
Claire Court, Rawmarsh Roadbattery storage40approved, not built0.6
Blackburn Meadowsbattery storage10operational3.1
Brinsworth Road, Brinsworthbattery storage40application submitted3.7
Thurcroft Interchange Energy Parkbattery storage50application submitted6.0
Thurcroft Interchange Energy Park Solar Farmsolar farm49.9application submitted6.0
Moat Lane, Wickersleybattery storage100approved, not built6.3
Green Lane, Thurcroftbattery storage85approved, not built6.5
Penny Hill Lanewind farm19.8operational6.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.4307, -1.3547).