Renewable energy projects in Redditch

13 solar, wind or battery projects of 150 kW or more are located in Redditch (REPD, July 2026 extract): 2 pending, 7 approved but not running, 2 operational and 0 refused.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

13projects in the council area
2awaiting a decision
7approved, not running
2operational

How Redditch decides

Redditch has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Projects in Redditch

Projects of 1 MW and more (4)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
Wheaten Hill Farmbattery storagebattery storage400application submittedupdated Oct 2025Aug 2025—Oct 2025
Astwood Lane, Feckenhambattery storagebattery storage200application withdrawnupdated May 2026Mar 2023—May 2026
Feckenham Energy Storage Systembattery storagebattery storage18application withdrawnupdated Nov 2018Apr 2017—Nov 2018
Thorlux Lighting Moons, Merse Roadrooftop solarrooftop solar1.4approved, not built may be out of dateupdated Feb 2022Jan 2022granted Feb 2022Feb 2022
Smaller schemes under 1 MW, mostly rooftop solar (9)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
Sainsburys, Abbey Trading Centrerooftop solarrooftop solar0.4approved, not builtupdated Jan 2025Nov 2024granted Jan 2025Jan 2025
Hsh Coldstores Limited, Moons Moat Driverooftop solarrooftop solar0.4approved, not builtupdated May 2023Mar 2023granted Apr 2023May 2023
Trinity High School And Sixth Form Centre, Easemore Roadrooftop solarrooftop solar0.3approved, not builtupdated May 2025Jan 2025granted Apr 2025May 2025
Sparlonz Limitedrooftop solarrooftop solar0.2approved, not builtupdated Dec 2021Oct 2021granted Dec 2021Dec 2021
Heming Point Roof Mounted Solar Panelsrooftop solarrooftop solar0.2operationalupdated Jun 2023Dec 2020granted Feb 2021Jun 2023
Arthur Streetrooftop solarrooftop solar0.2operationalupdated Mar 2022Jan 2022granted Mar 2022Mar 2022
Woolaston Roadbattery storagebattery storage—approved, not built may be out of dateupdated Sep 2020Aug 2020granted Dec 2020Sep 2020
Astwood Lane - Greener Grid Park & Energy Storagebattery storagebattery storage—approved, not built may be out of dateupdated Feb 2022Jan 2021granted Jan 2022Feb 2022
Feckenham Energy Storage Systembattery storagebattery storage—application submittedupdated Jul 2025May 2025—Jul 2025

Postcode districts in Redditch

DistrictProjects within 10 kmPendingApprovedOperational
B9619483
B97275142
B98205102

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Projects belong to Redditch by location (nearest postcode to the REPD grid reference); decisions are counted by the planning authority named in REPD.