Astwood Lane, Feckenham (200 MW battery storage)
Astwood Lane, Feckenham is a 200 MW battery storage project in Redditch, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 6 June 2025; the record was last updated on 8 May 2026.
200 MWbattery storage
application withdrawnstatus in REPD
8 May 2026record last updated
Redditchcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 31 March 2023 | Application submitted |
| 6 June 2025 | Application withdrawn |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 200 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 8 May 2026
- Operator or applicant
- Immersa Limited
- Planning authority
- Redditch
- Planning application reference
- 23/00417/FUL
- Address (REPD)
- Astwood Lane, Feckenham, Redditch
- Council area (by location)
- Redditch
- Name in REPD
- Astwood Lane, Feckenham - Battery Storage
- REPD reference
- 13707
Who decides
Redditch has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Feckenham Energy Storage System | battery storage | 18 | application withdrawn | 1.3 |
| Wheaten Hill Farm | battery storage | 400 | application submitted | 1.9 |
| Roundhill, Earls Common Road, Stock Green Solar Farm | solar farm | 49.9 | application withdrawn | 4.4 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.2536, -1.9807).