Feckenham Energy Storage System (18 MW)

Feckenham Energy Storage System is an 18 MW battery storage project in Redditch, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 13 November 2017; the record was last updated on 23 November 2018.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

18 MWbattery storage
application withdrawnstatus in REPD
23 November 2018record last updated
Redditchcouncil area

Planning timeline

DateStage
28 April 2017Application submitted
13 November 2017Application withdrawn

Project details

Technology
battery storage (stand-alone storage)
Capacity
18 MW
Status (REPD)
application withdrawn
Record last updated
23 November 2018
Operator or applicant
Anesco
Planning authority
Redditch
Planning application reference
17/00453/FUL
Address (REPD)
Land South of Feckenham Energy, Salt Way, Feckenham, Redditch
Council area (by location)
Redditch
REPD reference
6954

Who decides

Redditch has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Wheaten Hill Farmbattery storage400application submitted1.2
Astwood Lane, Feckenhambattery storage200application withdrawn1.3
Roundhill, Earls Common Road, Stock Green Solar Farmsolar farm49.9application withdrawn4.9
Bishampton Solar Farmsolar farm30under construction9.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.2472, -1.9654).