10 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of BD23 (North Yorkshire): 1 is waiting for a planning decision, 3 approved but not yet running, 3 operational. The largest live scheme is Dechra Pharmaceuticals Manufacturing, Building 3 (1.6 MW rooftop solar, approved on 6 September 2022, not yet built; REPD status may be out of date), 5.6 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10projects within 10 km
1awaiting a decision
3approved, not running
3operational

Projects within 10 km of BD23

Projects of 1 MW and more (6)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Dechra Pharmaceuticals Manufacturing, Building 3rooftop solarrooftop solar1.6approved, not built may be out of dateupdated Jul 2022Jul 2022granted Sep 2022Jul 2022North Yorkshire5.6
Brightenber Hillwind farmwind farm7.5refused on appealupdated Mar 2016Apr 2012refused Sep 2012Mar 2016North Yorkshire8.1
West Craven Business Park, West Craven Driverooftop solarrooftop solar1approved, not builtupdated Nov 2023Aug 2023granted Nov 2023Nov 2023Pendle9.7
Chelker Reservoir Repower (Resubmission)wind farmwind farm1.7refusedupdated Mar 2012Oct 2011refused Mar 2012Mar 2012North Yorkshire9.7
Chelker Reservoirwind farmwind farm1.3operationalupdated Jul 2009—granted Jul 1991Jul 2009North Yorkshire9.9
Chelker Reservoir (Retention of Turbines)wind farmwind farm1.2operationalupdated Dec 2011Jan 2001granted May 2001Dec 2011North Yorkshire9.9
Smaller schemes under 1 MW, mostly rooftop solar (4)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Souber Dairy, Crossgates Farmrooftop solarrooftop solar0.2application withdrawnupdated Dec 2022Oct 2022—Dec 2022North Yorkshire5.7
Souber Dairy, Bank Newtonrooftop solarrooftop solar0.2operationalupdated Mar 2023Mar 2023—Mar 2023North Yorkshire5.7
Halton East Quarriessolar farmsolar farm0.7approved, not builtupdated Mar 2026Nov 2025granted Feb 2026Mar 2026North Yorkshire7.9
Tow Top Farm, Babyhouse Lanerooftop solarrooftop solar0.1application submittedJun 2026——North Yorkshire8.3

Distance from the average position of the BD23 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm101000.7
Rooftop solar512102.7
Wind farm400220

MW in pipeline: pending, approved and under-construction capacity.

How North Yorkshire decides solar, wind and battery applications

ApplicationsNorth YorkshireUK
Decided applications (solar, wind, battery)16510,236
Refused28 (17%)19%
Solar refused15 of 11212%
Onshore wind refused8 of 2445%
Battery storage refused5 of 2916%
Median time from submission to decision15.3 weeks17.0 weeks
Appeals lodged / allowed13 / 12—

All projects in North Yorkshire

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near BD23, 1 project has a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.