Renewable energy projects in North Yorkshire

211 solar, wind or battery projects of 150 kW or more are located in North Yorkshire (REPD, July 2026 extract): 35 pending, 124 approved but not running, 27 operational and 10 refused. The council refused 28 of 165 decided applications (17%; UK 19%), with a median 15 weeks from submission to decision.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

211projects in the council area
35awaiting a decision
124approved, not running
17%of decisions refused

How North Yorkshire decides

ApplicationsNorth YorkshireUK
Decided applications (solar, wind, battery)16510,236
Refused28 (17%)19%
Solar refused15 of 11212%
Onshore wind refused8 of 2445%
Battery storage refused5 of 2916%
Median time from submission to decision15.3 weeks17.0 weeks
Appeals lodged / allowed13 / 12—

Projects in North Yorkshire

Projects of 1 MW and more (100)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
Mowbray Battery Energy Storage Stationbattery storagebattery storage1,000application submittedupdated Feb 2025Dec 2024—Feb 2025
Eggborough Battery Energy Storage Systembattery storagebattery storage550approved, not builtupdated Jul 2025Jun 2024granted May 2025Jul 2025
Eggborough Power Station, Selby Roadbattery storagebattery storage500approved, not built may be out of dateupdated Sep 2025Oct 2022granted Jan 2023Sep 2025
Solar Farm at Light Valley Solar Sitessolar farmsolar farm500application submittedupdated Jun 2026Mar 2026—Jun 2026
Monk Fryston Battery Storagebattery storagebattery storage320under constructionupdated Oct 2025Jun 2021granted Dec 2022Oct 2025
Springfield Farm, Hensallbattery storagebattery storage240approved, not builtupdated Jul 2024Mar 2023granted May 2024Jul 2024
Springfield Farm, Weeland Roadbattery storagebattery storage240approved, not builtupdated Jun 2025Jun 2024granted May 2025Jun 2025
Kellingley Farm, Stocking Lanebattery storagebattery storage240application submittedupdated Sep 2025Jul 2025—Sep 2025
Drax Re-Powerbattery storagebattery storage200approved, not builtupdated Jan 2020Feb 2018granted May 2018Jan 2020
Stocking Lane Battery Energy Facilitybattery storagebattery storage200application submitted may be out of dateupdated Oct 2023Sep 2023—Oct 2023
Corner Of Weeland Road, Lunn Lanebattery storagebattery storage200approved, not builtupdated Sep 2025Nov 2023granted Jul 2025Sep 2025
Rawfield Lanebattery storagebattery storage200approved, not builtupdated Sep 2025Oct 2024granted Aug 2025Sep 2025
Low Moor Lane, Scottonbattery storagebattery storage200application submittedupdated Mar 2026Dec 2025—Mar 2026
Helios Renewable Energy Projectsolar farmsolar farm190approved, not builtupdated Dec 2025Jul 2024granted Dec 2025Dec 2025
Hales Lanebattery storagebattery storage100approved, not built may be out of dateupdated May 2022Sep 2021granted May 2022May 2022
Third Energy UK Gas Limitedbattery storagebattery storage100approved, not built may be out of dateupdated Mar 2023Aug 2021granted Oct 2021Mar 2023
Lakeside Energy Storage Facilitybattery storagebattery storage99.9approved, not built may be out of dateupdated Dec 2021Dec 2020granted May 2021Dec 2021
Station Road, Carltonbattery storagebattery storage99approved, not builtupdated Jun 2025Oct 2024granted May 2025Jun 2025
Barlow Road, Barlow Roadbattery storagebattery storage80application withdrawnupdated Mar 2025Aug 2023—Mar 2025
Monk Fryston Battery Storagebattery storagebattery storage57under constructionupdated Oct 2025May 2021granted Aug 2022Oct 2025
Darlington Road, Skeebysolar farmsolar farm55operationalupdated Nov 2024Oct 2021granted Nov 2022Nov 2024
New Oaks, Station Roadbattery storagebattery storage50application submittedupdated Aug 2025Jun 2025—Aug 2025
Carlton Solar Farmsolar farmsolar farm50approved, not builtupdated Feb 2026Feb 2023granted Apr 2024Feb 2026
Pilmoor Solar Farmsolar farmsolar farm50approved, not builtupdated May 2026Nov 2023granted Sep 2024May 2026
Cayton Solar farmsolar farmsolar farm49.9approved, not builtupdated Aug 2023Jun 2019granted Jan 2022Aug 2023
South Lowfields Farmsolar farmsolar farm49.9approved, not built may be out of dateupdated Aug 2020Sep 2019granted Dec 2019Aug 2020
Camblesforth Solar Farmsolar farmsolar farm49.9approved, not built may be out of dateupdated Feb 2021Jun 2021granted Jul 2022Feb 2021
Osgodby Grange, Osgodby Solar Energysolar farmsolar farm49.9approved, not built may be out of dateupdated Mar 2026Sep 2021granted Jul 2022Mar 2026
Os Field 6800 Fence Dike Lane Solar Farmsolar farmsolar farm49.9approved, not builtupdated Jun 2023May 2021granted Jun 2023Jun 2023
Hillam Grange, Austfield Lane Solar Farmsolar farmsolar farm49.9approved, not builtupdated Jan 2026Dec 2023granted Dec 2025Jan 2026
Os Field, Husthwaitesolar farmsolar farm49.9approved, not builtupdated Nov 2025Sep 2023granted Oct 2025Nov 2025
Scalm Park, Wistow Solar Farm & Battery Energy Storagesolar farmsolar farm49.9approved, not builtupdated Sep 2025Nov 2024granted Sep 2025Sep 2025
Broad Lane, Cawood Solar Farm & Battery Storagesolar farmsolar farm49.9application submittedupdated Sep 2025Aug 2025—Sep 2025
Overton Grange, Overton Road Solar Farm Battery Energy Storagesolar farmsolar farm49.9application submittedupdated Aug 2025Jun 2025—Aug 2025
Newlands Farm, Turnham Lanesolar farmsolar farm49.9application submittedupdated Nov 2025Jul 2025—Nov 2025
Leys Lanesolar farmsolar farm49.9application submittedupdated Oct 2025Jun 2025—Oct 2025
Green Lane, Moor Monkton Solar Panels & Battery Energy Storage Systemsolar farmsolar farm49.9application submittedupdated Aug 2025Apr 2025—Aug 2025
Wormald Green Solar Farmsolar farmsolar farm43approved, not builtupdated Mar 2026Dec 2023granted Jul 2025Mar 2026
Rusholme Grangebattery storagebattery storage40operationalupdated Aug 2024May 2021granted Sep 2021Aug 2024
Hull Road, Lundbattery storagebattery storage40approved, not builtupdated Jan 2025Jul 2024granted Jan 2025Jan 2025
Solar Farm at North Of Brompton On Swalesolar farmsolar farm39.3approved, not builtupdated Sep 2025Feb 2025granted Aug 2025Sep 2025
Darlington Road, Skeebybattery storagebattery storage35under constructionupdated Mar 2026Jun 2023granted Aug 2023Mar 2026
York Solar Farmsolar farmsolar farm34.7operationalupdated May 2020Jun 2015granted Sep 2015May 2020
Wormald Greenbattery storagebattery storage33operationalupdated Feb 2026Mar 2022granted Jun 2022Feb 2026
Wood Lanewind farmwind farm32.2application withdrawnupdated Jan 2016Jul 2009—Jan 2016
Eastgate House Farm, Seamer Solar Farmsolar farmsolar farm32under constructionupdated Apr 2024Aug 2021granted Oct 2022Apr 2024
East Cowton Solar Farmsolar farmsolar farm30.8application submittedupdated Aug 2025Jul 2025—Aug 2025
Windmill Farm Solar Farm (Old Malton)solar farmsolar farm30.4approved, not builtupdated Feb 2026Jan 2023refused Oct 2023Feb 2026
Boscar Layby, Raskelfsolar farmsolar farm30application submittedupdated Jun 2025May 2025—Jun 2025
Stell Solar Farmsolar farmsolar farm30application submittedupdated Sep 2025Jul 2025—Sep 2025
Northallertonsolar farmsolar farm28abandonedupdated Jun 2018Jun 2015granted Oct 2015Jun 2018
Boscar Grange Farmbattery storagebattery storage27operationalupdated Dec 2019Oct 2018—Dec 2019
Redmoor Farmsolar farmsolar farm25.5permission expiredupdated Sep 2020Aug 2015granted Jan 2017Sep 2020
East Heslerton Wind Farmwind farmwind farm25refused on appealupdated Jul 2014Mar 2011refused May 2013Jul 2014
Rusholme Wind Farmwind farmwind farm24operationalupdated Dec 2014Jul 2004granted Oct 2006Dec 2014
Carr House Farm, East Heslerton Solar Farmsolar farmsolar farm23.5approved, not builtupdated Jun 2025Mar 2024granted Jun 2025Jun 2025
Solar Farm at East Appleton Farmsolar farmsolar farm23.5application submittedupdated Oct 2025Jun 2025—Oct 2025
Penny Pot Wind Farmwind farmwind farm21application withdrawnupdated Mar 2014Jul 2012—Mar 2014
Solar Farm at N/O Black Bridge Danby Wiskesolar farmsolar farm19application submittedupdated Jul 2025May 2025—Jul 2025
Juniper Farm, Main Street Solar Farmsolar farmsolar farm18.8application submittedupdated Aug 2025Jul 2025—Aug 2025
Solar Farm at Woodcock Solar Farmsolar farmsolar farm18.5refusedupdated May 2026Jan 2025refused Mar 2026May 2026
Queen Margarets Industrial Estatebattery storagebattery storage18abandonedupdated Dec 2019Jul 2018—Dec 2019
Scalm Park / Bishopwoodwind farmwind farm17.5appeal withdrawnupdated Aug 2018Jul 2009refused Jan 2013Aug 2018
Knabs Ridge Windfarmwind farmwind farm16operationalupdated May 2009Apr 2004granted Nov 2004May 2009
Cleek Hallwind farmwind farm15abandonedupdated Sep 2015Aug 2009granted Sep 2012Sep 2015
Windmill Farm Solar Farm (Old Malton)battery storagebattery storage12.6approved, not builtupdated Feb 2026Jan 2023granted Feb 2025Feb 2026
Station Lane, South Stainleysolar farmsolar farm10approved, not builtupdated May 2024Nov 2022granted Apr 2024May 2024
Weeland Road, Kellingley Solar Farmsolar farmsolar farm10application submittedupdated Nov 2024Oct 2024—Nov 2024
Juniper Farm, Main Streetbattery storagebattery storage10application submittedupdated Aug 2025Jul 2025—Aug 2025
Broad Lane, Cawood Solar Farm & Battery Storagebattery storagebattery storage10application submittedupdated Sep 2025Aug 2025—Sep 2025
Bullamoorwind farmwind farm8permission expiredupdated Sep 2020Dec 2008granted Dec 2010Sep 2020
High Boar Wind Farmwind farmwind farm8refusedupdated Apr 2015Oct 2012refused Apr 2015Apr 2015
Brightenber Hillwind farmwind farm7.5refused on appealupdated Mar 2016Apr 2012refused Sep 2012Mar 2016
Moto Wetherby Motorway Service Area, Deighton Gates Roundabout Solar Farmsolar farmsolar farm7approved, not builtupdated Aug 2024Nov 2023granted Aug 2024Aug 2024
Seamer Windfarm - Stockton on Teeswind farmwind farm6operationalupdated Nov 2012Mar 2009granted Aug 2009Nov 2012
North East of Ainderby Steeplesolar farmsolar farm5.9operationalupdated Dec 2017Mar 2014granted Dec 2014Dec 2017
Kingspan Insulation Solar Installationrooftop solarrooftop solar5operationalupdated Jun 2017Dec 2013granted Mar 2014Jun 2017
Barugh Farmsolar farmsolar farm5operationalupdated Jul 2017Nov 2014granted Jan 2015Jul 2017
Cold Harbour Farmsolar farmsolar farm5operationalupdated Dec 2015Nov 2014granted Feb 2015Dec 2015
Ravens Closesolar farmsolar farm5operationalupdated Mar 2018Feb 2015granted Mar 2016Mar 2018
Land South of Highfield Housesolar farmsolar farm5operationalupdated Aug 2016Feb 2015granted Jun 2015Aug 2016
Mill Hill Farmsolar farmsolar farm5operationalupdated Dec 2015Apr 2015granted Jul 2015Dec 2015
Pollington Solar Farmsolar farmsolar farm5operationalupdated Oct 2017Apr 2015granted Jul 2015Oct 2017
Land North of Sandhutton Lanesolar farmsolar farm5operationalupdated Dec 2017May 2015granted Sep 2015Dec 2017
Land East of Appleton Farmsolar farmsolar farm5operationalupdated Jun 2018Jun 2015granted Sep 2015Jun 2018
Land at Ash Row Farmsolar farmsolar farm5operationalupdated Feb 2016Jul 2015granted Sep 2015Feb 2016
Land at Stripe Farmsolar farmsolar farm5operationalupdated Jun 2018Jun 2015granted Sep 2015Jun 2018
Sudforth Lane (Kellingley Solar Farm)solar farmsolar farm5operationalupdated Oct 2017Apr 2015granted Aug 2015Oct 2017
Fountain Lot Solar Farmsolar farmsolar farm5refusedupdated Dec 2015Oct 2015refused Jan 2016Dec 2015
Sherburnrooftop solarrooftop solar5operationalupdated Nov 2017Jan 2014—Nov 2017
Jenny Field Drivebattery storagebattery storage5approved, not built may be out of dateupdated Oct 2023Nov 2017granted Jan 2018Oct 2023
Showfield Lanebattery storagebattery storage5approved, not built may be out of dateupdated Dec 2023Nov 2018granted Feb 2019Dec 2023
Woodcock Solar Farm, Sweeming Lanebattery storagebattery storage4.7application submittedupdated Feb 2025Jan 2025—Feb 2025
Escrick Park Community Power Projectwind farmwind farm4.6application withdrawnupdated Jun 2011——Jun 2011
Chelker Reservoir Repowerwind farmwind farm3.9application withdrawnupdated Dec 2011Feb 2011—Dec 2011
Ravens Closesolar farmsolar farm3.8refusedupdated Dec 2015Jul 2015refused Oct 2015Dec 2015
Burton Top Farmsolar farmsolar farm3.6abandonedupdated Mar 2019Sep 2015granted Nov 2015Mar 2019
Chelker Reservoir Repower (Resubmission)wind farmwind farm1.7refusedupdated Mar 2012Oct 2011refused Mar 2012Mar 2012
White Barn Farm, Station Roadwind farmwind farm1.7application submittedApr 2026——
Dechra Pharmaceuticals Manufacturing, Building 3rooftop solarrooftop solar1.6approved, not built may be out of dateupdated Jul 2022Jul 2022granted Sep 2022Jul 2022
Smaller schemes under 1 MW, mostly rooftop solar (60)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
Whitby Seafoods, Stainsacre Lane Industrial Estaterooftop solarrooftop solar0.9approved, not builtupdated Jul 2025May 2025granted Jul 2025Jul 2025
GXO Logistics, Hurricane Way Southrooftop solarrooftop solar0.7approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025
Cranswick Gourmet Pastry, Hugden Wayrooftop solarrooftop solar0.7approved, not builtupdated Dec 2022Oct 2022granted Dec 2022Dec 2022
Haven Leisure, Primrose Avenuerooftop solarrooftop solar0.7approved, not builtupdated May 2023Feb 2023granted Apr 2023May 2023
Cranswick Country Foods, Seafox Courtrooftop solarrooftop solar0.7under constructionupdated Apr 2023Oct 2022refused Dec 2022Apr 2023
Halton East Quarriessolar farmsolar farm0.7approved, not builtupdated Mar 2026Nov 2025granted Feb 2026Mar 2026
South Craven School, Holme Lane, Cross Hillsrooftop solarrooftop solar0.6approved, not builtupdated Nov 2024Sep 2024granted Oct 2024Nov 2024
Well Lane, Sutton-On-The-Forest Solar Array &110KW Battery Storagesolar farmsolar farm0.6application submittedupdated May 2026Feb 2026—May 2026
AD Calvert Architectural, Stone Yard - Redevelopment Master Plansolar farmsolar farm0.5approved, not builtupdated Feb 2024Apr 2023granted Feb 2024Feb 2024
J E Hartley, Roth Hill Lanerooftop solarrooftop solar0.5approved, not builtupdated May 2025Feb 2025granted Apr 2025May 2025
Rose Cottage, Easingwold To Craykerooftop solarrooftop solar0.5approved, not builtupdated Mar 2025Jan 2025granted Feb 2025Mar 2025
Wildon grange, Mill Field Lanesolar farmsolar farm0.5approved, not built may be out of dateupdated Mar 2023Sep 2022granted Mar 2023Mar 2023
J Revis & Sons, South Field Lanerooftop solarrooftop solar0.5approved, not builtupdated Mar 2023Jan 2023granted Mar 2023Mar 2023
Marshall aerospace, Kirkbymoorsiderooftop solarrooftop solar0.5approved, not builtupdated Jan 2024Nov 2023granted Jan 2024Jan 2024
Ling Farm, Langtoftwind farmwind farm0.5approved, not builtupdated Mar 2026Oct 2025granted Feb 2026Mar 2026
William Hare, Eastfieldrooftop solarrooftop solar0.5approved, not builtupdated Apr 2025Feb 2025granted Apr 2025Apr 2025
Scarborough Hospital, Woodlands Driverooftop solarrooftop solar0.5approved, not builtupdated Mar 2026Dec 2025granted Feb 2026Mar 2026
First Bus Hunslet Park Depot, Atkinson Streetrooftop solarrooftop solar0.5approved, not builtupdated Apr 2023Mar 2023granted Apr 2023Apr 2023
Linton Mill, Main Streetrooftop solarrooftop solar0.5approved, not builtupdated Mar 2025Jan 2025granted Mar 2025Mar 2025
Ripon Grammar School, Clotherholme Roadrooftop solarrooftop solar0.4approved, not builtupdated Dec 2024Jun 2024granted Nov 2024Dec 2024
Middleton Lodge, Kneeton Lanerooftop solarrooftop solar0.4approved, not built may be out of dateupdated Mar 2023Dec 2022granted Feb 2023Mar 2023
Friarage Hospitalrooftop solarrooftop solar0.4approved, not builtupdated Feb 2025Dec 2024granted Feb 2025Feb 2025
Harrogate Convention Centrerooftop solarrooftop solar0.4approved, not builtupdated Oct 2021Aug 2021granted Oct 2021Oct 2021
Darlington Roadrooftop solarrooftop solar0.4application withdrawnupdated Nov 2022Sep 2022—Nov 2022
Yorkshire Water Plc Sewage Works - Ground Mounted Solar PV Developmentsolar farmsolar farm0.4approved, not builtupdated Feb 2021Jun 2023granted Jul 2023Feb 2021
Deep Sea Electronics, Bridlingtonrooftop solarrooftop solar0.4approved, not builtupdated Mar 2024Jan 2024granted Feb 2024Mar 2024
The Swinton Estate, Swinton Roadsolar farmsolar farm0.4approved, not builtupdated Dec 2025Jul 2025granted Nov 2025Dec 2025
Harrogate South Waste Water Treatment Works - Ground Mounted Solar Arraysolar farmsolar farm0.4approved, not builtupdated Aug 2023Jun 2023granted Jun 2023Aug 2023
Hornington Manor, Oxton Lanerooftop solarrooftop solar0.4approved, not builtupdated Mar 2025Jan 2025granted Feb 2025Mar 2025
Sainsburys Supermarket, Stainsacre Lanerooftop solarrooftop solar0.3application submitted may be out of dateupdated Oct 2024Jul 2024—Oct 2024
Ripon Community Leisure Centre, Dallamires Lanerooftop solarrooftop solar0.3approved, not builtupdated Mar 2026Dec 2025granted Jan 2026Mar 2026
Lark Hall Farm, Romanby - Ground Mounted Solar Panelssolar farmsolar farm0.3approved, not built may be out of dateupdated Aug 2022Jul 2022granted Mar 2023Aug 2022
Cardale Park - Ground Mounted Solar Panelssolar farmsolar farm0.3approved, not builtupdated Oct 2024Apr 2024granted Sep 2024Oct 2024
Sainsburys Supermarket, Stainsacre Lanerooftop solarrooftop solar0.3approved, not builtupdated Sep 2024Jul 2024granted Sep 2024Sep 2024
Brickworks Forest Lane, Alnerooftop solarrooftop solar0.3approved, not builtupdated Dec 2024Oct 2024granted Dec 2024Dec 2024
M.H.Poskitt, Weeland Roadsolar farmsolar farm0.3approved, not builtupdated Jan 2026Sep 2025granted Nov 2025Jan 2026
Barneby Way, Boroughbridgesolar farmsolar farm0.3approved, not builtupdated Aug 2024Jun 2024granted Aug 2024Aug 2024
Rabbit Hill Park, Allerton Parkrooftop solarrooftop solar0.3approved, not builtupdated Mar 2023Feb 2023granted Mar 2023Mar 2023
Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridgesolar farmsolar farm0.3application submitted may be out of dateupdated Jul 2023Jul 2023—Jul 2023
Riverside Caravan Park, Slaidburn Road Solar PV Arraysrooftop solarrooftop solar0.3approved, not builtupdated Jan 2024Nov 2023granted Jan 2024Jan 2024
Cayton Bay Holiday Park, Mill Lanerooftop solarrooftop solar0.3approved, not builtupdated Jul 2024Apr 2024granted Jun 2024Jul 2024
Babcock Land Defence Limited, Dsg Leyburn Roadrooftop solarrooftop solar0.3approved, not builtupdated Dec 2024Jul 2024granted Sep 2024Dec 2024
Hunmanby Grange, Cans Dale To The Grange Solar Panels & BESSrooftop solarrooftop solar0.3application submittedMay 2026——
Duggleby Wold Farmhousewind turbinewind turbine0.2approved, not builtupdated Jul 2022Jul 2022granted Nov 2022Jul 2022
Pond View Farm, Tholthorpesolar farmsolar farm0.2approved, not built may be out of dateupdated May 2023Feb 2022granted May 2023May 2023
Park Farm, High Streetwind turbinewind turbine0.2approved, not builtupdated Dec 2025Aug 2025granted Nov 2025Dec 2025
Bartindale Road, Grindalewind turbinewind turbine0.2approved, not builtupdated Dec 2025Sep 2025granted Nov 2025Dec 2025
Gara Farm, Weaverthorpewind turbinewind turbine0.2approved, not builtupdated Jun 2026Nov 2025granted Apr 2026Jun 2026
Selby War Memorial Hospital, Doncaster Roadrooftop solarrooftop solar0.2approved, not builtupdated Apr 2026Dec 2025granted Jan 2026Apr 2026
Reighton Sands Holiday Village, Sands Roadrooftop solarrooftop solar0.2approved, not builtupdated May 2023Feb 2023granted Apr 2023May 2023
Heck Food, Lime Lanerooftop solarrooftop solar0.2operationalupdated Jul 2024Oct 2023granted Dec 2023Jul 2024
Forum Subsea Technologies, Ings Lanerooftop solarrooftop solar0.2approved, not builtupdated Jan 2023Dec 2022granted Jan 2023Jan 2023
Foss Way, Walkerville Industrial Estatesolar farmsolar farm0.2approved, not built may be out of dateupdated Mar 2023Dec 2022granted Jan 2023Mar 2023
Filey Waste Water Treatment Works, Carr House Farmsolar farmsolar farm0.2approved, not builtupdated Oct 2023May 2023granted Oct 2023Oct 2023
Malton Wastewater Treatment Works, Seven Lane Solar Panelssolar farmsolar farm0.2approved, not builtupdated Nov 2023Jun 2023granted Nov 2023Nov 2023
Sawley Hall, Sawleysolar farmsolar farm0.2application withdrawnupdated Aug 2023Jun 2023—Aug 2023
Magdalen Grange Farm, Carr Lanewind turbinewind turbine0.2approved, not builtupdated Apr 2026Oct 2025granted Mar 2026Apr 2026
Cat Babbleton Farm, Gantonwind farmwind farm0.2approved, not builtupdated Apr 2026May 2025granted Feb 2026Apr 2026
Cross Thorns Farm, Pasture Roadwind turbinewind turbine0.2approved, not builtupdated Jun 2026Nov 2025granted May 2026Jun 2026
Long Green Farmsolar farmsolar farm0.2application submitted may be out of dateupdated Sep 2020Jun 2020—Sep 2020

51 more projects not listed (furthest or smallest).

Postcode districts in North Yorkshire

DistrictProjects within 10 kmPendingApprovedOperational
BD2310133
BD240000
DL610321
DL716462
DL83030
DL911263
DL1014293
DL112100
HG1246132
HG2246132
HG3214112
HG413173
HG5233181
LS2416563
TS98033
YO75113
YO8313193
YO118060
YO129160
YO137050
YO14132100
YO178080
YO180000
YO214130
YO224130
YO51184121
YO605221
YO6112174
YO622020

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Projects belong to North Yorkshire by location (nearest postcode to the REPD grid reference); decisions are counted by the planning authority named in REPD.