Energy Projects Near You

Drax Re-Power (200 MW battery storage)

Drax Re-Power is a 200 MW battery storage project in North Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 24 May 2018, not yet built; the record was last updated on 2 January 2020. As a nationally significant project, it was decided by the Secretary of State responsible for energy at the time on a Development Consent Order after examination by the Planning Inspectorate.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

200 MWbattery storage
approved, not builtstatus in REPD
2 January 2020record last updated
North Yorkshirecouncil area

Planning timeline

DateStage
27 February 2018Application submitted
24 May 2018Development consent granted (Secretary of State)

Project details

Technology
battery storage (co-located with fossil fuel plant)
Capacity
200 MW
Status (REPD)
approved, not built
Record last updated
2 January 2020
Operator or applicant
Drax Group
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
not recorded
Address (REPD)
New Road, Drax, Selby, North Yorkshire
Council area (by location)
North Yorkshire
Time to decision
12 weeks
REPD reference
7017

Who decides

As a nationally significant project, it was decided by the Secretary of State responsible for energy at the time on a Development Consent Order after examination by the Planning Inspectorate. All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Lakeside Energy Storage Facilitybattery storage99.9approved, not built0.4
Hales Lanebattery storage100approved, not built1.0
Carlton Solar Farmsolar farm50approved, not built1.1
Camblesforth Solar Farmsolar farm49.9approved, not built1.7
Station Road, Carltonbattery storage99approved, not built2.6
Rusholme Wind Farmwind farm24operational3.1
Rusholme Grangebattery storage40operational3.8
Cleek Hallwind farm15abandoned5.2
Hull Road, Lundbattery storage40approved, not built5.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7323, -0.9953).