Solar Farm at Woodcock Solar Farm (18.5 MW)

Solar Farm at Woodcock Solar Farm is an 18.5 MW solar farm project in North Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 31 March 2026; the record was last updated on 12 May 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

18.5 MWsolar farm
refusedstatus in REPD
12 May 2026record last updated
North Yorkshirecouncil area

Planning timeline

DateStage
27 January 2025Application submitted
31 March 2026Refused by the planning authority

Project details

Technology
solar farm
Capacity
18.5 MW
Status (REPD)
refused
Record last updated
12 May 2026
Operator or applicant
AEUK Solar Project IX
Planning authority
North Yorkshire
Planning application reference
ZG2024/1322/FULM
Site area
18.6 ha
Address (REPD)
Woodcock Solar Farm, Se/O Little Fenton, Sweeming Lane, Little Fenton, Leeds
Council area (by location)
North Yorkshire
Time to decision
61 weeks
Name in REPD
Woodcock Solar Farm, Sweeming Lane - Solar Farm
REPD reference
16639

Recorded together with Woodcock Solar Farm, Sweeming Lane (4.7 MW battery storage, application submitted).

Who decides

ApplicationsNorth YorkshireUK
Decided applications (solar, wind, battery)16510,236
Refused28 (17%)19%
Solar refused15 of 11212%
Onshore wind refused8 of 2445%
Battery storage refused5 of 2916%
Median time from submission to decision15.3 weeks17.0 weeks
Appeals lodged / allowed13 / 12—

Other large projects within 10 km

ProjectTypeMWStatuskm
Land at Ash Row Farmsolar farm5operational1.7
Kingspan Insulation Solar Installationrooftop solar5operational2.2
Scalm Park, Wistow Solar Farm & Battery Energy Storagesolar farm49.9approved, not built4.6
Scalm Park / Bishopwoodwind farm17.5appeal withdrawn4.6
Broad Lane, Cawood Solar Farm & Battery Storagesolar farm49.9application submitted5.5
Solar Farm at Light Valley Solar Sitessolar farm500application submitted5.7
Hillam Grange, Austfield Lane Solar Farmsolar farm49.9approved, not built6.0
Monk Fryston Battery Storagebattery storage57under construction7.3
Monk Fryston Battery Storagebattery storage320under construction7.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.8101, -1.2052).