Land at Ash Row Farm (5 MW solar farm)

Land at Ash Row Farm is a 5 MW solar farm project in North Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 21 December 2015; the record was last updated on 22 February 2016.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
operationalstatus in REPD
22 February 2016record last updated
North Yorkshirecouncil area

Planning timeline

DateStage
13 July 2015Application submitted
29 September 2015Planning permission granted
26 October 2015Construction started
21 December 2015Operational

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
operational
Record last updated
22 February 2016
Operator or applicant
Lightsource Renewable Energy
Planning authority
North Yorkshire
Planning application reference
2015/0777/FUL
Site area
10.5 ha
Address (REPD)
Ash Row Farm, Bishopdyke Road, Sherburn in Elmet, Leeds, West Yorkshire
Council area (by location)
North Yorkshire
Time to decision
11 weeks
REPD reference
5402

Who decides

ApplicationsNorth YorkshireUK
Decided applications (solar, wind, battery)16510,236
Refused28 (17%)19%
Solar refused15 of 11212%
Onshore wind refused8 of 2445%
Battery storage refused5 of 2916%
Median time from submission to decision15.3 weeks17.0 weeks
Appeals lodged / allowed13 / 12—

Other large projects within 10 km

ProjectTypeMWStatuskm
Kingspan Insulation Solar Installationrooftop solar5operational0.6
Solar Farm at Woodcock Solar Farmsolar farm18.5refused1.7
Solar Farm at Light Valley Solar Sitessolar farm500application submitted4.1
Hillam Grange, Austfield Lane Solar Farmsolar farm49.9approved, not built4.4
Scalm Park / Bishopwoodwind farm17.5appeal withdrawn4.9
Scalm Park, Wistow Solar Farm & Battery Energy Storagesolar farm49.9approved, not built4.9
Monk Fryston Battery Storagebattery storage57under construction5.7
Monk Fryston Battery Storagebattery storage320under construction5.8
Wood Lanewind farm32.2application withdrawn6.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7968, -1.2174).