Solar Farm at N/O Black Bridge Danby Wiske (19 MW)

Solar Farm at N/O Black Bridge Danby Wiske is a 19 MW solar farm project in North Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 23 May 2025, no decision recorded; the record was last updated on 8 July 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

19 MWsolar farm
application submittedstatus in REPD
8 July 2025record last updated
North Yorkshirecouncil area

Planning timeline

DateStage
23 May 2025Application submitted

Project details

Technology
solar farm
Capacity
19 MW
Status (REPD)
application submitted
Record last updated
8 July 2025
Operator or applicant
PS Renewables Limited
Planning authority
North Yorkshire
Planning application reference
ZB25/00887/FUL
Address (REPD)
N/O Black Bridge Danby Wiske
Council area (by location)
North Yorkshire
Name in REPD
Cross Rein Bank Solar Farm - Solar Farm
REPD reference
17281

Who decides

ApplicationsNorth YorkshireUK
Decided applications (solar, wind, battery)16510,236
Refused28 (17%)19%
Solar refused15 of 11212%
Onshore wind refused8 of 2445%
Battery storage refused5 of 2916%
Median time from submission to decision15.3 weeks17.0 weeks
Appeals lodged / allowed13 / 12—

Other large projects within 10 km

ProjectTypeMWStatuskm
East Cowton Solar Farmsolar farm30.8application submitted5.0
Northallertonsolar farm28abandoned5.8
South Lowfields Farmsolar farm49.9approved, not built6.3
North East of Ainderby Steeplesolar farm5.9operational7.3
Bullamoorwind farm8permission expired7.4
Os Field 6800 Fence Dike Lane Solar Farmsolar farm49.9approved, not built7.7
Land East of Appleton Farmsolar farm5operational9.6
Solar Farm at East Appleton Farmsolar farm23.5application submitted9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.3892, -1.5).