Solar, wind and battery projects near Congleton (CW12)

3 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of CW12 (Cheshire East): 2 approved but not yet running, 1 operational. The largest live scheme is London Road, Holmes Chapel Photovoltaic Panels (1 MW rooftop solar, under construction), 9.8 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

3projects within 10 km
0awaiting a decision
2approved, not running
1operational

Projects within 10 km of CW12

Smaller schemes under 1 MW, mostly rooftop solar (3)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Arclid Sand Quarryrooftop solarrooftop solar0.4operationalupdated Jun 2026Aug 2025granted Oct 2025Jun 2026Cheshire East7.9
Reynolds Farm, Reynolds Lanerooftop solarrooftop solar0.2approved, not builtupdated May 2025Feb 2025granted Mar 2025May 2025Cheshire East8.0
London Road, Holmes Chapel Photovoltaic Panelsrooftop solarrooftop solar1under constructionupdated Apr 2021Feb 2021granted Jul 2021Apr 2021Cheshire East9.8

Distance from the average position of the CW12 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Rooftop solar302101.2

MW in pipeline: pending, approved and under-construction capacity.

How Cheshire East decides solar, wind and battery applications

ApplicationsCheshire EastUK
Decided applications (solar, wind, battery)4010,236
Refused4 (10%)19%
Solar refused4 of 3612%
Battery storage refused0 of 416%
Median time from submission to decision11.1 weeks17.0 weeks
Appeals lodged / allowed2 / 1—

All projects in Cheshire East

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Check the council's planning register for the latest decision.