Solar, wind and battery projects near London (E15)
86 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of E15 (Newham): 11 are waiting for a planning decision, 58 approved but not yet running, 7 operational. The largest live scheme is Atcost Road (100 MW battery storage, application submitted on 2 May 2024, no decision recorded; REPD status may be out of date), 7.5 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of E15
Projects of 1 MW and more (10)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Olympic Park Wind Turbinewind turbine | wind turbine | 2.5 | abandonedupdated Oct 2010 | Jan 2007 | granted Sep 2007 | Oct 2010 | Newham | 1.3 |
| Bywaters’ Materials Recovery Facility Solar Arrayrooftop solar | rooftop solar | 1 | operationalupdated Feb 2017 | Oct 2015 | granted Dec 2015 | Feb 2017 | Tower Hamlets | 2.1 |
| The O2 Arenawind farm | wind farm | 3 | approved, not built may be out of dateupdated Oct 2021 | Jun 2021 | granted Sep 2021 | Oct 2021 | Greenwich | 4.3 |
| Solar Panels at Hedgehog Grove Solar Farmsolar farm | solar farm | 98 | application submittedupdated Apr 2026 | Mar 2026 | — | Apr 2026 | Tower Hamlets | 4.5 |
| Beckton Sewage Treatment Workswind farm | wind farm | 2.2 | operationalupdated Feb 2015 | — | — | Feb 2015 | Newham | 5.5 |
| Thameside DCrooftop solar | rooftop solar | 1 | operationalupdated Feb 2016 | — | — | Feb 2016 | Greenwich | 5.6 |
| Alcatel, Telegraph Houserooftop solar | rooftop solar | 1.3 | refusedupdated Dec 2025 | Sep 2025 | refused Oct 2025 | Dec 2025 | Greenwich | 5.6 |
| Atcost Roadbattery storage | battery storage | 100 | application submitted may be out of dateupdated May 2024 | May 2024 | — | May 2024 | Barking and Dagenham | 7.5 |
| Queen Elizabeth Hospital, Stadium Roadrooftop solar | rooftop solar | 1.6 | refusedupdated Dec 2025 | Oct 2025 | refused Nov 2025 | Dec 2025 | Greenwich | 7.6 |
| Crossness Sewage Works PVrooftop solar | rooftop solar | 1.5 | operationalupdated Jan 2012 | — | — | Jan 2012 | Bexley | 10.0 |
Smaller schemes under 1 MW, mostly rooftop solar (60)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| University Of East London - 650 Student accommodation & Teaching and learningrooftop solar | rooftop solar | 0.2 | under constructionupdated Jun 2026 | Apr 2023 | granted Aug 2025 | Jun 2026 | Newham | 0.6 |
| University Of East London, Stratford Cam PV Panelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Apr 2024 | Jan 2024 | granted Mar 2024 | Apr 2024 | Newham | 0.7 |
| Westfield Stratford City, Montfichet Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Newham | 0.8 |
| New Spitalfields Market, Allen Houserooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2026 | Feb 2026 | granted Apr 2026 | Jun 2026 | Waltham Forest | 2.2 |
| Segro Park Canning, Town Bidder Street, Unit 2rooftop solar | rooftop solar | 0.2 | approved, not builtupdated Aug 2025 | Jun 2025 | granted Jul 2025 | Aug 2025 | Newham | 2.5 |
| Newham University Hospital, Glen Roadrooftop solar | rooftop solar | 0.8 | approved, not builtupdated May 2026 | Jan 2026 | granted Mar 2026 | May 2026 | Newham | 2.9 |
| Newham Leisure Centre, Prince Regent Lanerooftop solar | rooftop solar | 0.2 | application submitted may be out of dateupdated Feb 2023 | Dec 2022 | — | Feb 2023 | Newham | 3.1 |
| Plashet Schoolrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Aug 2025 | May 2025 | granted Jul 2025 | Aug 2025 | Newham | 3.2 |
| Homerton University Hospital, Homerton Groverooftop solar | rooftop solar | 0.3 | approved, not builtupdated Apr 2026 | Jan 2026 | granted Feb 2026 | Apr 2026 | Hackney | 3.6 |
| Custom Housebattery storage | battery storage | 0.2 | approved, not builtupdated Sep 2025 | Feb 2025 | granted Aug 2025 | Sep 2025 | Newham | 3.6 |
| Roman Road Primary School, Roman Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2025 | May 2025 | granted Jul 2025 | Jul 2025 | Newham | 3.7 |
| Ellen Wilkinson School, Tollgate Road Solar PhotovoltaicPanelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated May 2024 | Jan 2024 | granted Apr 2024 | May 2024 | Newham | 4.0 |
| Leyes Road - New SEN Schoolrooftop solar | rooftop solar | 0.2 | under constructionupdated Sep 2025 | Sep 2023 | granted Nov 2023 | Sep 2025 | Newham | 4.1 |
| Mowlem Junior And Infant School, Mowlem Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Tower Hamlets | 4.1 |
| Town Hall Hotel, Patriot Squarerooftop solar | rooftop solar | 0.1 | application submitted | May 2026 | — | — | Tower Hamlets | 4.2 |
| Citibank, 25 Canada Square - Office Fit-Out & Refurbishmentrooftop solar | rooftop solar | — | no application requiredupdated Feb 2022 | — | — | Feb 2022 | Tower Hamlets | 4.3 |
| Newham Dockside - Photovoltaic Panelsrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Mar 2022 | Jan 2022 | granted Mar 2022 | Mar 2022 | Newham | 4.7 |
| Sainsbury, Claps Gate Lanerooftop solar | rooftop solar | 0.4 | application submitted | May 2026 | — | — | Newham | 4.8 |
| Holly Streetrooftop solar | rooftop solar | 0.2 | operationalupdated Jan 2022 | Aug 2021 | granted Feb 2023 | Jan 2022 | Hackney | 5.2 |
| The Exchange Mall, High Roadrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Dec 2024 | Oct 2024 | granted Nov 2024 | Dec 2024 | Redbridge | 5.3 |
| New England Industrial Estate Developmentrooftop solar | rooftop solar | 0.2 | under constructionupdated May 2023 | Mar 2021 | granted Sep 2021 | May 2023 | Barking and Dagenham | 5.4 |
| Nightingale Primary School, Ashbourne Avenue -Solar Panelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2025 | May 2025 | granted Jun 2025 | Jul 2025 | Redbridge | 5.4 |
| Coppermill Workssolar farm | solar farm | 0.7 | application submitted may be out of dateupdated Aug 2022 | Jul 2022 | — | Aug 2022 | Waltham Forest | 5.4 |
| Knowledge Dock, University Wayrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Sep 2023 | Jul 2023 | granted Sep 2023 | Sep 2023 | Newham | 5.4 |
| London Design and Engineering UTC, University Waywind farm | wind farm | 0.2 | application submitted | May 2026 | — | — | Newham | 5.5 |
| Circular 13, Unit B, Gascoigne Roadrooftop solar | rooftop solar | 1 | approved, not builtupdated Jun 2023 | Apr 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 5.6 |
| University Of East London Dockland Campus, University Way - Soalr Panelsrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2024 | Oct 2023 | granted Dec 2023 | Jan 2024 | Newham | 5.6 |
| The Highway - 114 Flats, Office Accomodation & Self Storage Facilityrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | Dec 2021 | granted Aug 2023 | Jul 2024 | Tower Hamlets | 5.7 |
| Millennium Retail Park - Flats & Retail Spacerooftop solar | rooftop solar | 0.3 | application submitted may be out of dateupdated Sep 2024 | May 2024 | — | Sep 2024 | Greenwich | 5.7 |
| Spire London East Hospital, Roding Lane Southrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Sep 2024 | Sep 2024 | Redbridge | 5.9 |
| Jobcentreplus, Drysdale Streetrooftop solar | rooftop solar | — | approved, not builtupdated Sep 2025 | May 2025 | granted Jul 2025 | Sep 2025 | Hackney | 5.9 |
| Swan Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | refusedupdated Jun 2023 | Apr 2023 | refused Jun 2023 | Jun 2023 | Greenwich | 5.9 |
| Siemens Roadrooftop solar | rooftop solar | 0.7 | refusedupdated Jun 2023 | Apr 2023 | refused Jun 2023 | Jun 2023 | Greenwich | 5.9 |
| Siemens Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Greenwich | 5.9 |
| Siemens Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Greenwich | 5.9 |
| John Orwell Sports Centre, Tench Streetrooftop solar | rooftop solar | 0.3 | approved, not builtupdated May 2025 | Feb 2025 | granted Apr 2025 | May 2025 | Tower Hamlets | 6.0 |
| Stone Lake Retail Park, Woolwich Roadrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Greenwich | 6.0 |
| Paul Rhodes Bakery Limited, Lassell Streetrooftop solar | rooftop solar | — | refusedupdated May 2025 | Mar 2025 | refused May 2025 | May 2025 | Greenwich | 6.1 |
| Atlantis Avenue, Beckton Solar PV Systemsrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Jun 2023 | Apr 2023 | granted Jun 2023 | Jun 2023 | Newham | 6.2 |
| Roding Lane Southrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jan 2023 | Oct 2022 | granted Dec 2022 | Jan 2023 | Redbridge | 6.2 |
| The Valley, Floyd Roadrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2025 | Jun 2025 | granted Jul 2025 | Aug 2025 | Greenwich | 6.5 |
| Redbridge Institute Of Adult Education, Gaysham Avenuerooftop solar | rooftop solar | 0.1 | approved, not builtupdated Nov 2025 | Sep 2025 | granted Oct 2025 | Nov 2025 | Redbridge | 6.5 |
| Churchfields Junior School, Churchfieldsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Aug 2023 | granted Oct 2023 | Oct 2023 | Redbridge | 6.6 |
| Tower Place Westrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Mar 2025 | Jan 2025 | granted Feb 2025 | Mar 2025 | City of London | 6.7 |
| Maybank Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2025 | Jul 2025 | granted Aug 2025 | Sep 2025 | Redbridge | 6.8 |
| The Bermondsey Projectrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Oct 2017 | granted Jun 2020 | Oct 2023 | Southwark | 6.9 |
| Woodbridge High School, St Barnabas Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Nov 2024 | Sep 2024 | granted Oct 2024 | Nov 2024 | Redbridge | 7.1 |
| Dagenham Motors, Ripple Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2023 | May 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 7.1 |
| Cannon Streetrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jan 2025 | Sep 2024 | granted Dec 2024 | Jan 2025 | City of London | 7.2 |
| Manor Joinery Estate, Eastern Approach Alfreds Wayrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Mar 2023 | Dec 2022 | granted Feb 2023 | Mar 2023 | Barking and Dagenham | 7.2 |
| Nic Ice, Thames Roadrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2025 | Nov 2024 | granted Dec 2024 | Jan 2025 | Barking and Dagenham | 7.2 |
| City Of London Academyrooftop solar | rooftop solar | 0.2 | approved, not built may be out of dateupdated May 2022 | Feb 2022 | granted May 2022 | May 2022 | Southwark | 7.4 |
| The I O Centre, Skeffington Streetrooftop solar | rooftop solar | 0.2 | refusedupdated Feb 2026 | Nov 2025 | refused Jan 2026 | Feb 2026 | Greenwich | 7.4 |
| Lindsey Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Dec 2025 | Oct 2025 | granted Nov 2025 | Dec 2025 | City of London | 7.5 |
| Woodford County High Schoolrooftop solar | rooftop solar | 0.3 | application withdrawnupdated Jun 2026 | Feb 2026 | — | Jun 2026 | Waltham Forest | 7.6 |
| Brookhill Estate Regenerationrooftop solar | rooftop solar | 0.1 | approved, not built may be out of dateupdated May 2022 | Apr 2022 | granted Mar 2023 | May 2022 | Greenwich | 7.6 |
| William Torbitt School, Eastern Avenuerooftop solar | rooftop solar | 0.2 | application submitted | May 2026 | — | — | Redbridge | 7.9 |
| Twin Tumps Wayrooftop solar | rooftop solar | 0.6 | operationalupdated Mar 2022 | Feb 2022 | granted Dec 2022 | Mar 2022 | Greenwich | 7.9 |
| Roding Primary School and Nursery, Roding Lane Northrooftop solar | rooftop solar | 0.1 | approved, not built | Apr 2026 | granted Jun 2026 | — | Redbridge | 7.9 |
| Walworth Academy, Shorncliffe Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Feb 2024 | Dec 2023 | granted Jan 2024 | Feb 2024 | Southwark | 8.2 |
16 more projects not listed (furthest or smallest).
Distance from the average position of the E15 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Solar farm | 2 | 2 | 0 | 0 | 0 | 98.7 |
| Rooftop solar | 78 | 7 | 56 | 6 | 6 | 18.7 |
| Wind farm | 3 | 1 | 1 | 1 | 0 | 3.2 |
| Wind turbine | 1 | 0 | 0 | 0 | 0 | 0 |
| Battery storage | 2 | 1 | 1 | 0 | 0 | 100 |
MW in pipeline: pending, approved and under-construction capacity.
How Newham decides solar, wind and battery applications
| Applications | Newham | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 17 | 10,236 |
| Refused | 1 (6%) | 19% |
| Solar refused | 1 of 15 | 12% |
| Onshore wind refused | 0 of 1 | 45% |
| Battery storage refused | 0 of 1 | 16% |
| Median time from submission to decision | 8.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near E15, 10 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.