Solar, wind and battery projects near London (EC3R)
73 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of EC3R (City of London): 10 are waiting for a planning decision, 48 approved but not yet running, 3 operational. The largest live scheme is Solar Panels at Hedgehog Grove Solar Farm (98 MW solar farm, application submitted on 24 March 2026, no decision recorded), 4.6 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of EC3R
Projects of 1 MW and more (9)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Pegasus House, Sackville Streetrooftop solar | rooftop solar | 2.3 | approved, not built may be out of dateupdated Dec 2021 | Nov 2021 | granted Dec 2021 | Dec 2021 | Westminster | 3.8 |
| Solar Panels at Hedgehog Grove Solar Farmsolar farm | solar farm | 98 | application submittedupdated Apr 2026 | Mar 2026 | — | Apr 2026 | Tower Hamlets | 4.6 |
| Bywaters’ Materials Recovery Facility Solar Arrayrooftop solar | rooftop solar | 1 | operationalupdated Feb 2017 | Oct 2015 | granted Dec 2015 | Feb 2017 | Tower Hamlets | 5.4 |
| Olympic Park Wind Turbinewind turbine | wind turbine | 2.5 | abandonedupdated Oct 2010 | Jan 2007 | granted Sep 2007 | Oct 2010 | Newham | 5.6 |
| The O2 Arenawind farm | wind farm | 3 | approved, not built may be out of dateupdated Oct 2021 | Jun 2021 | granted Sep 2021 | Oct 2021 | Greenwich | 6.2 |
| Alcatel, Telegraph Houserooftop solar | rooftop solar | 1.3 | refusedupdated Dec 2025 | Sep 2025 | refused Oct 2025 | Dec 2025 | Greenwich | 6.7 |
| Thameside DCrooftop solar | rooftop solar | 1 | operationalupdated Feb 2016 | — | — | Feb 2016 | Greenwich | 7.9 |
| Westfield London Shopping Centre, Ariel Wayrooftop solar | rooftop solar | 1 | application submitted may be out of dateupdated Jul 2023 | Jun 2023 | — | Jul 2023 | Hammersmith and Fulham | 9.6 |
| Queen Elizabeth Hospital, Stadium Roadrooftop solar | rooftop solar | 1.6 | refusedupdated Dec 2025 | Oct 2025 | refused Nov 2025 | Dec 2025 | Greenwich | 9.9 |
Smaller schemes under 1 MW, mostly rooftop solar (60)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Tower Place Westrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Mar 2025 | Jan 2025 | granted Feb 2025 | Mar 2025 | City of London | 0.3 |
| Cannon Streetrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jan 2025 | Sep 2024 | granted Dec 2024 | Jan 2025 | City of London | 0.4 |
| The Highway - 114 Flats, Office Accomodation & Self Storage Facilityrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | Dec 2021 | granted Aug 2023 | Jul 2024 | Tower Hamlets | 1.5 |
| Lindsey Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Dec 2025 | Oct 2025 | granted Nov 2025 | Dec 2025 | City of London | 1.5 |
| John Orwell Sports Centre, Tench Streetrooftop solar | rooftop solar | 0.3 | approved, not builtupdated May 2025 | Feb 2025 | granted Apr 2025 | May 2025 | Tower Hamlets | 1.7 |
| Jobcentreplus, Drysdale Streetrooftop solar | rooftop solar | — | approved, not builtupdated Sep 2025 | May 2025 | granted Jul 2025 | Sep 2025 | Hackney | 2.0 |
| The Bermondsey Projectrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Oct 2017 | granted Jun 2020 | Oct 2023 | Southwark | 2.4 |
| Bush Houserooftop solar | rooftop solar | — | approved, not built may be out of dateupdated Jun 2021 | Apr 2021 | granted May 2021 | Jun 2021 | Westminster | 2.4 |
| Walworth Academy, Shorncliffe Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Feb 2024 | Dec 2023 | granted Jan 2024 | Feb 2024 | Southwark | 2.6 |
| City Of London Academyrooftop solar | rooftop solar | 0.2 | approved, not built may be out of dateupdated May 2022 | Feb 2022 | granted May 2022 | May 2022 | Southwark | 2.7 |
| Town Hall Hotel, Patriot Squarerooftop solar | rooftop solar | 0.1 | application submitted | May 2026 | — | — | Tower Hamlets | 2.9 |
| Mowlem Junior And Infant School, Mowlem Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Tower Hamlets | 3.2 |
| Holly Streetrooftop solar | rooftop solar | 0.2 | operationalupdated Jan 2022 | Aug 2021 | granted Feb 2023 | Jan 2022 | Hackney | 3.6 |
| London St Pancras International Station - Installation Of Solar Panelsrooftop solar | rooftop solar | — | no application requiredupdated Mar 2025 | — | — | Mar 2025 | Camden | 3.8 |
| University College Hospital, Euston Roadrooftop solar | rooftop solar | 0.2 | approved, not built may be out of dateupdated Nov 2022 | Sep 2022 | granted Nov 2022 | Nov 2022 | Camden | 4.0 |
| Peckham Pulse Leisure Centre, Melon Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Feb 2025 | Nov 2024 | granted Jan 2025 | Feb 2025 | Southwark | 4.1 |
| Consession Queen Mother Sports Centrerooftop solar | rooftop solar | — | application submitted may be out of dateupdated Oct 2021 | Oct 2021 | — | Oct 2021 | Westminster | 4.4 |
| Dolphin Squarerooftop solar | rooftop solar | — | under constructionupdated May 2022 | Apr 2022 | granted Dec 2022 | May 2022 | Westminster | 4.5 |
| Citibank, 25 Canada Square - Office Fit-Out & Refurbishmentrooftop solar | rooftop solar | — | no application requiredupdated Feb 2022 | — | — | Feb 2022 | Tower Hamlets | 4.6 |
| William Booth Training College, Champion Parkrooftop solar | rooftop solar | — | approved, not built may be out of dateupdated Jul 2023 | Feb 2023 | granted Aug 2023 | Jul 2023 | Southwark | 4.8 |
| William Booth Training College, Champion Parkrooftop solar | rooftop solar | — | application submitted may be out of dateupdated Jul 2023 | Jul 2023 | — | Jul 2023 | Southwark | 4.8 |
| Waste & Recycling centre, Hornsey Streetrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Nov 2023 | Sep 2023 | granted Nov 2023 | Nov 2023 | Islington | 4.9 |
| Homerton University Hospital, Homerton Groverooftop solar | rooftop solar | 0.3 | approved, not builtupdated Apr 2026 | Jan 2026 | granted Feb 2026 | Apr 2026 | Hackney | 5.2 |
| London Zoo, Outer Circlerooftop solar | rooftop solar | 0.2 | approved, not builtupdated May 2025 | Feb 2025 | granted Apr 2025 | May 2025 | Westminster | 5.7 |
| Segro Park Canning, Town Bidder Street, Unit 2rooftop solar | rooftop solar | 0.2 | approved, not builtupdated Aug 2025 | Jun 2025 | granted Jul 2025 | Aug 2025 | Newham | 5.9 |
| Battersea Studiosrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Sep 2024 | Sep 2024 | Wandsworth | 6.1 |
| Imperial College Health CentreSolar Panelsrooftop solar | rooftop solar | — | application withdrawnupdated Apr 2021 | Feb 2021 | — | Apr 2021 | Westminster | 6.3 |
| Westfield Stratford City, Montfichet Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Newham | 6.4 |
| Paul Rhodes Bakery Limited, Lassell Streetrooftop solar | rooftop solar | — | refusedupdated May 2025 | Mar 2025 | refused May 2025 | May 2025 | Greenwich | 6.5 |
| Crompton Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Dec 2021 | Oct 2021 | granted Nov 2021 | Dec 2021 | Westminster | 6.6 |
| New Spitalfields Market, Allen Houserooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2026 | Feb 2026 | granted Apr 2026 | Jun 2026 | Waltham Forest | 6.8 |
| 45 Clapham Campus South Side - 525 Flats & Education Facilityrooftop solar | rooftop solar | 0.2 | application submitted may be out of dateupdated Apr 2023 | Oct 2022 | — | Apr 2023 | Lambeth | 7.0 |
| Millennium Retail Park - Flats & Retail Spacerooftop solar | rooftop solar | 0.3 | application submitted may be out of dateupdated Sep 2024 | May 2024 | — | Sep 2024 | Greenwich | 7.2 |
| Chelsea And Westminster Hospital, Fulham Road - Photovoltaic Panelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2026 | Mar 2026 | granted Apr 2026 | Jun 2026 | Kensington and Chelsea | 7.4 |
| Custom Housebattery storage | battery storage | 0.2 | approved, not builtupdated Sep 2025 | Feb 2025 | granted Aug 2025 | Sep 2025 | Newham | 7.4 |
| University Of East London - 650 Student accommodation & Teaching and learningrooftop solar | rooftop solar | 0.2 | under constructionupdated Jun 2026 | Apr 2023 | granted Aug 2025 | Jun 2026 | Newham | 7.4 |
| University Of East London, Stratford Cam PV Panelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Apr 2024 | Jan 2024 | granted Mar 2024 | Apr 2024 | Newham | 7.5 |
| David Lloyd Leisurerooftop solar | rooftop solar | 0.2 | refusedupdated Sep 2025 | Jul 2025 | refused Sep 2025 | Sep 2025 | Westminster | 7.9 |
| Dulwich College, College Roadrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Feb 2025 | Jun 2024 | granted Dec 2024 | Feb 2025 | Southwark | 7.9 |
| Newham Leisure Centre, Prince Regent Lanerooftop solar | rooftop solar | 0.2 | application submitted may be out of dateupdated Feb 2023 | Dec 2022 | — | Feb 2023 | Newham | 8.1 |
| Henderson Court, Fitzjohns Avenuerooftop solar | rooftop solar | 0.2 | approved, not built may be out of dateupdated Nov 2022 | Aug 2022 | granted Nov 2022 | Nov 2022 | Camden | 8.1 |
| Coppermill Workssolar farm | solar farm | 0.7 | application submitted may be out of dateupdated Aug 2022 | Jul 2022 | — | Aug 2022 | Waltham Forest | 8.1 |
| Newham University Hospital, Glen Roadrooftop solar | rooftop solar | 0.8 | approved, not builtupdated May 2026 | Jan 2026 | granted Mar 2026 | May 2026 | Newham | 8.3 |
| Harbour club, Watermeadow Lanerooftop solar | rooftop solar | 0.4 | application withdrawnupdated Jul 2024 | Nov 2023 | — | Jul 2024 | Hammersmith and Fulham | 8.4 |
| Leyes Road - New SEN Schoolrooftop solar | rooftop solar | 0.2 | under constructionupdated Sep 2025 | Sep 2023 | granted Nov 2023 | Sep 2025 | Newham | 8.4 |
| Stone Lake Retail Park, Woolwich Roadrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Greenwich | 8.5 |
| The Valley, Floyd Roadrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2025 | Jun 2025 | granted Jul 2025 | Aug 2025 | Greenwich | 8.8 |
| Swan Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | refusedupdated Jun 2023 | Apr 2023 | refused Jun 2023 | Jun 2023 | Greenwich | 8.9 |
| Siemens Roadrooftop solar | rooftop solar | 0.7 | refusedupdated Jun 2023 | Apr 2023 | refused Jun 2023 | Jun 2023 | Greenwich | 8.9 |
| Siemens Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Greenwich | 8.9 |
| Siemens Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Greenwich | 8.9 |
| Ellen Wilkinson School, Tollgate Road Solar PhotovoltaicPanelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated May 2024 | Jan 2024 | granted Apr 2024 | May 2024 | Newham | 8.9 |
| Roman Road Primary School, Roman Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2025 | May 2025 | granted Jul 2025 | Jul 2025 | Newham | 9.0 |
| Newham Dockside - Photovoltaic Panelsrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Mar 2022 | Jan 2022 | granted Mar 2022 | Mar 2022 | Newham | 9.1 |
| Fulham Pools, Lillie Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated May 2024 | Jan 2024 | granted Apr 2024 | May 2024 | Hammersmith and Fulham | 9.1 |
| Kensington Leisure Centre, Silchester Roadrooftop solar | rooftop solar | 0.2 | approved, not built may be out of dateupdated Mar 2023 | Oct 2022 | granted Feb 2023 | Mar 2023 | Kensington and Chelsea | 9.1 |
| The Queens Club, Palliser Roadrooftop solar | rooftop solar | 0.5 | approved, not built may be out of dateupdated Jun 2023 | Feb 2023 | granted May 2023 | Jun 2023 | Hammersmith and Fulham | 9.3 |
| Knights Hill Solar PV equipmentrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2023 | Aug 2023 | granted Sep 2023 | Sep 2023 | Lambeth | 9.4 |
| Moberly Sports Centre - Photovoltaic Arraysrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Nov 2021 | Nov 2021 | granted Dec 2021 | Nov 2021 | Brent | 9.4 |
| Moberly Sports Centre - Photovoltaic Arraysrooftop solar | rooftop solar | — | refusedupdated Oct 2021 | Oct 2021 | refused Oct 2021 | Oct 2021 | Brent | 9.4 |
4 more projects not listed (furthest or smallest).
Distance from the average position of the EC3R postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Solar farm | 2 | 2 | 0 | 0 | 0 | 98.7 |
| Rooftop solar | 68 | 8 | 46 | 3 | 7 | 16.9 |
| Wind farm | 1 | 0 | 1 | 0 | 0 | 3 |
| Wind turbine | 1 | 0 | 0 | 0 | 0 | 0 |
| Battery storage | 1 | 0 | 1 | 0 | 0 | 0.2 |
MW in pipeline: pending, approved and under-construction capacity.
How City of London decides solar, wind and battery applications
City of London has 4 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.
All projects in City of London
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near EC3R, 16 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.