Energy Projects Near You

Solar, wind and battery projects near Reading (RG8)

10 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of RG8 (West Berkshire): 6 approved but not yet running, 1 operational. The largest live scheme is Icknield Road, Ipsden Solar Array & Battery Storage (1.4 MW solar farm, approved on 15 December 2022, not yet built; REPD status may be out of date), 5.2 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10projects within 10 km
0awaiting a decision
6approved, not running
1operational

Projects within 10 km of RG8

Projects of 1 MW and more (4)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Icknield Road, Ipsden Solar Array & Battery Storagesolar farmsolar farm1.4approved, not built may be out of dateupdated Mar 2022Jul 2022granted Dec 2022Mar 2022South Oxfordshire5.2
Mazelands Farmsolar farmsolar farm2.8refusedupdated May 2016Sep 2015refused Apr 2016May 2016West Berkshire8.0
Winterbrooksolar farmsolar farm1.2operationalupdated Dec 2017Sep 2014granted Jan 2015Dec 2017South Oxfordshire9.1
Burghfield Road, Southcotebattery storagebattery storage7.4application withdrawnupdated Jul 2024Sep 2023—Jul 2024Reading9.8
Smaller schemes under 1 MW, mostly rooftop solar (6)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Wallingford Road Energy Centrebattery storagebattery storage—refusedupdated Feb 2022Dec 2020refused Nov 2021Feb 2022South Oxfordshire4.1
Icknield Road, Ipsden Solar Array & Battery Storagebattery storagebattery storage—approved, not built may be out of dateupdated Mar 2022Jul 2022granted Dec 2022Mar 2022South Oxfordshire5.2
Renegade Brewery, Frilshamrooftop solarrooftop solar0.5approved, not builtupdated Jul 2023May 2023granted Jul 2023Jul 2023West Berkshire8.2
Arlington Business Park, Theale - Roof Mounted Solar panel PVrooftop solarrooftop solar0.2approved, not builtupdated Dec 2024Oct 2024granted Dec 2024Dec 2024West Berkshire8.4
The Globe, Portman Roadrooftop solarrooftop solar0.2approved, not built may be out of dateupdated Apr 2024Feb 2024granted Mar 2024Apr 2024Reading8.9
Portman Road Tesco (Reading West)rooftop solarrooftop solar0.2approved, not built may be out of dateupdated Apr 2021Feb 2020granted May 2020Apr 2021Reading9.1

Distance from the average position of the RG8 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm301111.4
Rooftop solar404001.1
Battery storage301010

MW in pipeline: pending, approved and under-construction capacity.

How West Berkshire decides solar, wind and battery applications

ApplicationsWest BerkshireUK
Decided applications (solar, wind, battery)3310,236
Refused7 (21%)19%
Solar refused4 of 2512%
Onshore wind refused3 of 345%
Battery storage refused0 of 516%
Median time from submission to decision13.4 weeks17.0 weeks
Appeals lodged / allowed2 / 2—

All projects in West Berkshire

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near RG8, 4 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.