Arleston Solar & Battery Energy Storage System (43 MW)

Arleston Solar & Battery Energy Storage System is a 43 MW solar farm project in South Derbyshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 2 July 2025, no decision recorded; the record was last updated on 4 September 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

43 MWsolar farm
application submittedstatus in REPD
4 September 2025record last updated
South Derbyshirecouncil area

Planning timeline

DateStage
2 July 2025Application submitted

Project details

Technology
solar farm
Capacity
43 MW
Status (REPD)
application submitted
Record last updated
4 September 2025
Operator or applicant
Noventum Power Limited
Planning authority
South Derbyshire
Planning application reference
DMOT/2025/0113
Site area
48.8 ha
Address (REPD)
Manor Farm, Arleston Lane, Arleston, Derby
Council area (by location)
South Derbyshire
REPD reference
18141

The scheme also includes 99.9 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsSouth DerbyshireUK
Decided applications (solar, wind, battery)2610,236
Refused5 (19%)19%
Solar refused4 of 1412%
Battery storage refused1 of 1216%
Median time from submission to decision28.6 weeks17.0 weeks
Appeals lodged / allowed1 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Stenson Lanebattery storage400approved, not built<0.1
Landown Farm, Bakeacre Lanebattery storage40approved, not built3.0
Solar Farm at Toyota Manufacturing Ukrooftop solar16application submitted4.7
Newton Solney Solar Farmsolar farm21.1refused6.9
Derby Road, Eggintonbattery storage100approved, not built7.0
Derby Sewage Treatment Workswind farm5operational7.7
Claymills Sewage Treatment Works, Meadow Lanesolar farm25application submitted9.3
Rollston on Dove, Marston Lanesolar farm5abandoned9.7
East Midlands Distribution Centrerooftop solar6.1operational9.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.8634, -1.5006).