Atlantic Array One - Bristol Channel Zone offshore wind farm

Atlantic Array One - Bristol Channel Zone is a 1,200 MW offshore wind farm with 240 turbines in English waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 25 November 2013; the record was last updated on 26 November 2013. Its REPD grid reference is 24 km from the nearest postcode on land (EX39 2LY, Torridge). It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

1,200 MWoffshore wind farm
application withdrawnstatus in REPD
26 November 2013record last updated
24 km from land (Torridge)REPD location

Consent timeline

DateStage
12 July 2013Application submitted
25 November 2013Application withdrawn

Project details

Technology
offshore wind farm
Capacity
1,200 MW
Turbines
240
Turbine capacity
5 MW
Status (REPD)
application withdrawn
Record last updated
26 November 2013
Operator or applicant
Npower
Consenting authority (REPD)
DECC (S36)
Application reference
not recorded
Nearest postcode on land
EX39 2LY (Torridge), 23.7 km from the REPD grid reference
REPD reference
2508

Who decides

It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Postcode districts within 40 km

Districtkm
Tenby (SA70)35.8
Ilfracombe (EX34)37.3
Saundersfoot (SA69)39.2
Braunton (EX33)39.3

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (51.3694, -4.5672).