Energy Projects Near You

Offshore wind farms in UK waters

The Renewable Energy Planning Database (July 2026 extract) lists 109 offshore wind projects in UK waters: 49 operational (16.0 GW), 8 under construction, 29 approved but not yet built and 14 awaiting a decision (18.1 GW). The largest operational is Hornsea 2 - Optimus and Breesea (1,320 MW); the largest in the pipeline is Berwick Bank Offshore Wind Farm (4,100 MW, approved, not built).

How it works ↓

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

109offshore wind projects
49 · 16.0 GWoperational
37approved or under construction
14awaiting a decision

By country

WatersProjectsBuiltGW builtApprovedPendingGW pipeline
England673411.025029.8
Scotland36124.3101430.1
Wales630.7200.9

Waters: the country REPD records for the project. Built: operational; approved: approved or under construction. GW pipeline: approved, under construction and pending capacity.

Off the coast of the UK, offshore wind farms are mostly in English waters: that is where the most turbines and gigawatts operate. The next wave is gathering further north, in Scottish waters, where every application awaiting a decision sits. Councils do not approve these projects: in English and Welsh waters the Energy Secretary decides, in Scotland it is the Scottish Ministers, and refusals from either are rare. The picture below is built from the July 2026 REPD extract; some project statuses have not been updated for a long time; the record last updated date is shown in the project table.

Contents
  1. How many farms there are and at what stage
  2. England, Scotland, Wales: where farms run and where the queue sits
  3. Largest farms: operational and in the queue
  4. Who approves and how often refusals happen
  5. Farms near your coast
  6. The essentials on offshore wind from the extract

↓ All offshore wind projects↓ Who consents offshore wind

How many farms there are and at what stage

The register holds 109 offshore wind projects. 49 are operational, together 16.0 GW; another 37 are approved or under construction (8 on site, 29 with permission but work not started), and 14 are awaiting a decision. That works out at roughly three approved or under-construction farms for every four operational ones.

England, Scotland, Wales: where farms run and where the queue sits

English waters hold 34 operational farms totalling 11.0 GW. Scotland has 12 operational ones at 4.3 GW, plus all 14 applications awaiting a decision. A few more farms operate in the Irish Sea off the Welsh coast. Onshore and offshore projects for each nation are gathered on the England, Scotland and Wales pages.

Largest farms: operational and in the queue

Among operational farms, Hornsea 2 - Optimus and Breesea comes first at 1,320 MW: it stands in the North Sea, 100 km from the East Riding of Yorkshire coast. The largest in the queue is Berwick Bank at 4,100 MW: permission granted, construction not started. Under construction are Dogger Bank A and B, with Dogger Bank C and Sofia next to them in the register.

Who approves and how often refusals happen

In English and Welsh waters the Energy Secretary decides: formerly under Section 36 of the Electricity Act, now as a nationally significant infrastructure project, through a development consent order (DCO) after examination by the Planning Inspectorate. In Scotland the Scottish Ministers decide through Marine Scotland. Of 90 offshore wind decisions in REPD, a refusal appears in 6 records, and some of those refusals were later overturned. All ministerial decisions on solar and wind are collected on the Energy Secretary decisions page.

Farms near your coast

Offshore farms sit far from shore, so the search radius for them is wider than for onshore ones. Enter your postcode district on the homepage: the district page will list offshore farms within 40 km of its centre. Distance is measured from the project point in the register to the nearest postcode on land.

The essentials on offshore wind from the extract

Of 109 projects, 49 are operational (16.0 GW), 37 are approved or under construction, 14 are awaiting a decision, all of them in Scottish waters. England leads on operational farms: 34 at 11.0 GW against Scotland's 12 at 4.3 GW. The largest operational farm is Hornsea 2 (1,320 MW), the largest approved one Berwick Bank (4,100 MW). Refusals are rare: 6 records out of 90 decisions. Statuses and dates come from the REPD extract for July 2026; the register may lag behind decisions, and decisions made after the extract are not shown on the site.

All offshore wind projects

Operational · Approved or under construction · Awaiting a decision · Refused, withdrawn or closed

Operational (49)

ProjectMWStatus (REPD)REPD locationDecided by
Hornsea 2 - Optimus and Breesea100 km from land (East Riding of Yorkshire)1,320operationalupdated Sep 2022100 km from land (East Riding of Yorkshire)Secretary of State (DCO)
Hornsea 1 - Heron & Njord83 km from land (North Norfolk)1,218operationalupdated Sep 202083 km from land (North Norfolk)Secretary of State (DCO)
Seagreen30 km from land (Aberdeenshire)1,075operationalupdated Oct 202330 km from land (Aberdeenshire)Scottish Ministers
Moray East29 km from land (Moray)950operationalupdated Apr 202329 km from land (Moray)Scottish Ministers (S36)
Moray West Offshore Wind Farm Project17 km from land (Highland)882operationalupdated May 202617 km from land (Highland)Scottish Ministers
Triton Knoll27 km from land (North Norfolk)857operationalupdated Mar 202227 km from land (North Norfolk)Secretary of State (DCO)
East Anglia 1 (EA 1)38 km from land (East Suffolk)714operationalupdated Aug 202038 km from land (East Suffolk)Secretary of State (DCO)
Walney 329 km from land (Cumberland)659operationalupdated Jun 202029 km from land (Cumberland)Secretary of State (S36)
London Array Phase 126 km from land (Thanet)630operationalupdated Nov 201826 km from land (Thanet)Secretary of State (S36)
Beatrice30 km from land (Highland)588operationalupdated May 201930 km from land (Highland)Scottish Ministers (S36)
Gwynt y Mor17 km from land (Denbighshire)576operationalupdated Aug 202017 km from land (Denbighshire)Secretary of State (S36)
Greater Gabbard Wind Farm33 km from land (East Suffolk)504operationalupdated Oct 201933 km from land (East Suffolk)Secretary of State (S36)
Neart na Gaoithe21 km from land (Fife)450operationalupdated Mar 202621 km from land (Fife)Scottish Ministers
Dudgeon East16 km from land (King's Lynn and West Norfolk)402operationalupdated Jan 202016 km from land (King's Lynn and West Norfolk)Secretary of State (S36)
Rampion Offshore Wind Farm (Hastings Zone)20 km from land (Brighton and Hove)400operationalupdated Dec 201920 km from land (Brighton and Hove)Secretary of State (DCO)
West of Duddon Sands18 km from land (Westmorland and Furness)389operationalupdated Aug 202018 km from land (Westmorland and Furness)Secretary of State (S36)
Galloper Wind Farm42 km from land (East Suffolk)353operationalupdated Oct 201942 km from land (East Suffolk)Secretary of State (DCO)
Sheringham Shoal21 km from land (North Norfolk)317operationalupdated Nov 201921 km from land (North Norfolk)Secretary of State (S36)
Thanet14 km from land (Thanet)300operationalupdated May 201814 km from land (Thanet)Secretary of State (S36)
Race Bank (Phase 1)16 km from land (East Lindsey)290operationalupdated Aug 202016 km from land (East Lindsey)Secretary of State (S36)
Race Bank (Phase 2)16 km from land (East Lindsey)284operationalupdated Aug 202016 km from land (East Lindsey)Secretary of State (S36)
Centrica (Lincs)10 km from land (East Lindsey)270operationalupdated May 201810 km from land (East Lindsey)Secretary of State (S36)
Burbo Bank Extension (Burbo Bank 2)11 km from land (Wirral)258operationalupdated May 201811 km from land (Wirral)Secretary of State (DCO)
Humber Gateway A16 km from land (East Lindsey)219operationalupdated Oct 201616 km from land (East Lindsey)Secretary of State (S36)
Westermost Rough A15 km from land (King's Lynn and West Norfolk)210operationalupdated Apr 201815 km from land (King's Lynn and West Norfolk)Secretary of State (S36)
Walney 118 km from land (Westmorland and Furness)184operationalupdated Sep 202018 km from land (Westmorland and Furness)Secretary of State (S36)
Walney 223 km from land (Westmorland and Furness)184operationalupdated Sep 202023 km from land (Westmorland and Furness)Secretary of State (S36)
Ormonde Offshore12 km from land (Westmorland and Furness)150operationalupdated Aug 201712 km from land (Westmorland and Furness)Secretary of State (S36)
Gunfleet Sands Offshore Wind Scheme7 km from land (Tendring)108operationalupdated May 20187 km from land (Tendring)Secretary of State (S36)
Inner Dowsing6 km from land (East Lindsey)97.2operationalupdated Aug 20176 km from land (East Lindsey)Secretary of State (S36)
Lynn7 km from land (East Lindsey)97.2operationalupdated Aug 20177 km from land (East Lindsey)Secretary of State (S36)
European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)on the coast (Aberdeen City)96.8operationalupdated Apr 2019on the coast (Aberdeen City)Scottish Ministers (S36)
Burbo Bank9 km from land (Sefton)90operationalupdated Feb 20189 km from land (Sefton)Secretary of State (S36)
Kentish Flats10 km from land (Canterbury)90operationalupdated Oct 201710 km from land (Canterbury)Secretary of State (S36)
Rhyl Flats9 km from land (Conwy)90operationalupdated Aug 20179 km from land (Conwy)Secretary of State (S36)
Robin Rigg West12 km from land (Dumfries and Galloway)90operationalupdated Aug 201712 km from land (Dumfries and Galloway)Scottish Ministers (S36)
Barrow9 km from land (Westmorland and Furness)90operationalupdated Nov 20179 km from land (Westmorland and Furness)Secretary of State (S36)
Robin Rigg East12 km from land (Dumfries and Galloway)84operationalupdated Aug 201712 km from land (Dumfries and Galloway)Scottish Ministers (S36)
Gunfleet Sands II9 km from land (Tendring)64.8operationalupdated Nov 20179 km from land (Tendring)Secretary of State (S36)
Teesside Offshore Wind Farm3 km from land (Redcar and Cleveland)62operationalupdated May 20153 km from land (Redcar and Cleveland)Secretary of State (S36)
North Hoyle9 km from land (Denbighshire)60operationalupdated Aug 20179 km from land (Denbighshire)Secretary of State (S36)
Scroby Sands4 km from land (Great Yarmouth)60operationalupdated Feb 20164 km from land (Great Yarmouth)Secretary of State (S36)
Kentish Flats 29 km from land (Canterbury)49.5operationalupdated Jun 20169 km from land (Canterbury)Secretary of State (DCO)
Kincardine Offshore Windfarm16 km from land (Aberdeenshire)49.5operationalupdated Mar 202216 km from land (Aberdeenshire)Scottish Ministers
Blyth Offshore Wind Test Site9 km from land (Northumberland)41.5operationalupdated Jul 20189 km from land (Northumberland)Marine Management Organisation
Hywind Scotland Pilot Park (Hywind 2) Demonstrator20 km from land (Aberdeenshire)30operationalupdated Jul 201820 km from land (Aberdeenshire)Scottish Ministers
Gunfleet Sands - (Demo) Extension9 km from land (Tendring)12operationalupdated Nov 20179 km from land (Tendring)Secretary of State (S36)
Beatrice Demonstrator19 km from land (Highland)10operationalupdated May 201719 km from land (Highland)Scottish Ministers (S36)
Levenmouth demonstration turbine (Fife Energy Park)4 km from land (Fife)7operationalupdated Nov 20184 km from land (Fife)Scottish Ministers (S36)

Approved or under construction (37)

ProjectMWStatus (REPD)REPD locationDecided by
Berwick Bank Offshore Wind Farm66 km from land (Aberdeenshire)4,100approved, not builtupdated Jan 202666 km from land (Aberdeenshire)Scottish Ministers
Ossianlocation not in REPD3,600approved, not builtupdated Jul 2025location not in REPDScottish Ministers
Hornsea 383 km from land (North Norfolk)2,955under constructionupdated Jun 202683 km from land (North Norfolk)Secretary of State (DCO)
Hornsea 483 km from land (North Norfolk)2,400approved, not builtupdated May 202583 km from land (North Norfolk)Secretary of State (DCO)
Dogger Bank A & B (was Creyke Beck A & B)212 km from land (Northumberland)2,400under constructionupdated Apr 2022212 km from land (Northumberland)Secretary of State (DCO)
West of Orkney Wind Farm32 km from land (Highland)2,000approved, not builtupdated Jul 202532 km from land (Highland)Scottish Ministers
Mona Offshore Wind Farm33 km from land (Conwy)1,500approved, not builtupdated Mar 202633 km from land (Conwy)Secretary of State (DCO)
Morgan Offshore Wind Farmlocation not in REPD1,500approved, not builtupdated Mar 2026location not in REPDSecretary of State (DCO)
Dogger Bank South Eastlocation not in REPD1,500approved, not builtupdated Jun 2026location not in REPDSecretary of State (DCO)
Outer Dowsing Offshore Wind Farm57 km from land (North Norfolk)1,500approved, not builtupdated Mar 202657 km from land (North Norfolk)Secretary of State (DCO)
Dogger Bank South Westlocation not in REPD1,500approved, not builtupdated Jun 2026location not in REPDSecretary of State (DCO)
East Anglia 3 (EA 3)38 km from land (East Suffolk)1,400under constructionupdated Dec 202538 km from land (East Suffolk)Secretary of State (DCO)
The East Anglia Array - Norfolk Boreas55 km from land (Great Yarmouth)1,400under constructionupdated Dec 202555 km from land (Great Yarmouth)Secretary of State (DCO)
Sofia (Teesside B)198 km from land (East Riding of Yorkshire)1,400under constructionupdated Sep 2022198 km from land (East Riding of Yorkshire)Secretary of State (DCO)
The East Anglia Array - Norfolk Vanguard East55 km from land (Great Yarmouth)1,380approved, not builtupdated Jan 202655 km from land (Great Yarmouth)Secretary of State (DCO)
The East Anglia Array - Norfolk Vanguard West55 km from land (Great Yarmouth)1,380approved, not builtupdated Jan 202655 km from land (Great Yarmouth)Secretary of State (DCO)
Dogger Bank C (was Teesside A)198 km from land (East Riding of Yorkshire)1,200under constructionupdated Apr 2022198 km from land (East Riding of Yorkshire)Secretary of State (DCO)
Rampion 2 Offshore Wind Farm (Rampion extension)20 km from land (Brighton and Hove)1,200approved, not builtupdated May 202520 km from land (Brighton and Hove)Secretary of State (DCO)
Inch Cape22 km from land (Angus)1,080under constructionupdated Jun 202622 km from land (Angus)Scottish Ministers
Five Estuaries Wind Farmon the coast (East Suffolk)1,080approved, not builtupdated Jun 2026on the coast (East Suffolk)Secretary of State (DCO)
North Falls Offshore Wind Farmlocation not in REPD1,000approved, not builtupdated Jun 2026location not in REPDSecretary of State (DCO)
East Anglia 2 (EA 2)30 km from land (Great Yarmouth)900approved, not builtupdated Apr 202230 km from land (Great Yarmouth)Secretary of State (DCO)
East Anglia 1 North (EA 4)38 km from land (East Suffolk)800approved, not builtupdated Apr 202238 km from land (East Suffolk)Secretary of State (DCO)
Awel y Mor Offshore Wind Farm14 km from land (Conwy)775approved, not builtupdated Mar 202614 km from land (Conwy)Secretary of State (DCO)
Green Volt - Offshore Wind FarmREPD point not at the site560approved, not builtupdated May 2024REPD point not at the siteScottish Ministers
Seagreen Phase 1A30 km from land (Aberdeenshire)540approved, not builtupdated Jul 202330 km from land (Aberdeenshire)Scottish Ministers
Morecambe Offshore Windfarmlocation not in REPD480approved, not builtupdated Mar 2026location not in REPDSecretary of State (DCO)
Dudgeon Extension Project23 km from land (North Norfolk)402approved, not builtupdated Jan 202423 km from land (North Norfolk)Secretary of State (DCO)
Sheringham Extension Project23 km from land (North Norfolk)317approved, not builtupdated Jan 202423 km from land (North Norfolk)Secretary of State (DCO)
Erebus Floating Offshore Wind Demonstration Projecton the coast (Pembrokeshire)100approved, not builtupdated Jan 2026on the coast (Pembrokeshire)Welsh Government
Whitecross - Offshore Wind Farmon the coast (North Devon)100approved, not builtupdated Sep 2025on the coast (North Devon)Marine Management Organisation
Pentland Floating Offshore Wind Farmon the coast (Highland)100approved, not builtupdated Jan 2026on the coast (Highland)Scottish Ministers
Blyth Offshore Wind Farm Phase 2 Demonstrator Project9 km from land (Northumberland)58.4approved, not builtupdated Apr 20229 km from land (Northumberland)Marine Management Organisation
TwinHub (previously called Wave Hub Floating Wind)on the coast (Cornwall)32approved, not builtupdated Dec 2021on the coast (Cornwall)Secretary of State (DCO)
Forthwind3 km from land (Fife)20approved, not builtupdated Aug 20233 km from land (Fife)Scottish Ministers
Dounreay Trì Floating Wind Demonstration15 km from land (Highland)10under constructionupdated Dec 201915 km from land (Highland)Scottish Ministers
Culzean Floating Wind Pilot222 km from land (Aberdeenshire)3approved, not builtupdated Oct 2024222 km from land (Aberdeenshire)Scottish Ministers

Awaiting a decision (14)

ProjectMWStatus (REPD)REPD locationDecided by
Marramlocation not in REPD3,000application submittedupdated Jul 2026location not in REPDScottish Ministers
Machairlocation not in REPD2,000application submittedupdated Jul 2026location not in REPDScottish Ministers
Bellrock133 km from land (Aberdeenshire)1,800application submittedupdated Jul 2026133 km from land (Aberdeenshire)Scottish Ministers
Morven North Offshore Wind Farmlocation not in REPD1,450application submittedupdated Jul 2026location not in REPDScottish Ministers
Morven South Offshore Wind Farmlocation not in REPD1,450application submittedlocation not in REPDScottish Ministers
Cenos Offshore Wind Farmlocation not in REPD1,350application submittedupdated Apr 2025location not in REPDScottish Ministers
Moray Firth - Caledonia South Offshore Wind FarmREPD point not at the site1,100application submitted may be out of dateupdated Dec 2024REPD point not at the siteScottish Ministers
Cluaran Deas Ear / Ayre Wind Farm (Thistle South East) (NE2)location not in REPD1,008application submittedupdated Jul 2026location not in REPDScottish Ministers
Fraserburgh - Buchan Floating Wind Projectlocation not in REPD1,000application submittedupdated Jul 2026location not in REPDScottish Ministers
Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3)48 km from land (Aberdeenshire)1,000application submittedupdated Jul 202648 km from land (Aberdeenshire)Scottish Ministers
Muir Mhòrlocation not in REPD1,000application submittedupdated Dec 2024location not in REPDScottish Ministers
Moray Firth - Caledonia North Offshore Wind FarmREPD point not at the site900application submittedupdated Dec 2024REPD point not at the siteScottish Ministers
Spiorad na Maralocation not in REPD900application submittedupdated Jul 2026location not in REPDScottish Ministers
Peterhead - The Salamander Project67 km from land (Aberdeenshire)100application submitted may be out of dateupdated Jul 202467 km from land (Aberdeenshire)Scottish Ministers
Refused, withdrawn, abandoned or decommissioned (9)
ProjectMWStatus (REPD)REPD locationDecided by
Atlantic Array One - Bristol Channel Zone24 km from land (Torridge)1,200application withdrawnupdated Nov 201324 km from land (Torridge)Secretary of State (S36)
Navitus Bay24 km from land (Dorset)970refusedupdated Nov 201524 km from land (Dorset)Secretary of State (DCO)
Docking Shoal A22 km from land (North Norfolk)540refusedupdated Jul 201222 km from land (North Norfolk)Secretary of State (S36)
Thanet (extension)11 km from land (Thanet)340refusedupdated Jun 202011 km from land (Thanet)Secretary of State (S36)
Cirrus Shell Flat Array8 km from land (Wyre)284application withdrawnupdated Dec 20088 km from land (Wyre)Secretary of State (S36)
London Array Phase 211 km from land (Swale)240abandonedupdated Jan 201511 km from land (Swale)Scottish Ministers
Cromer12 km from land (North Norfolk)108abandonedupdated Mar 201012 km from land (North Norfolk)Secretary of State (S36)
Scarweather Sands10 km from land (Bridgend)108application withdrawnupdated Jan 201010 km from land (Bridgend)Secretary of State (S36)
Blyth Offshore1 km from land (Northumberland)4decommissionedupdated Jun 20191 km from land (Northumberland)Secretary of State (S36)

REPD location: straight-line distance from the project's REPD grid reference to the nearest postcode on land, with that postcode's council. REPD gives one point per project: for 6 projects it is on the coast (probably the onshore connection) and for 18 there is no point at all. Projects of 5 MW and more have their own page.

Who consents offshore wind

Decision maker (REPD)DecisionsRefusedMedian weeks
Secretary of State (DCO)33384
Secretary of State (S36)30396
Scottish Ministers16057
Scottish Ministers (S36)7081
Marine Management Organisation30122
Welsh Government1060

Decisions: REPD records with a consent or refusal date; “refused” counts every record with a refusal date, including refusals later overturned (the Energy Secretary decisions page counts each application once, by its final grant). Median weeks: from submission to decision, where both dates are recorded.