Blyth Offshore Wind Farm Phase 2 Demonstrator Project offshore wind farm

Blyth Offshore Wind Farm Phase 2 Demonstrator Project is a 58.4 MW offshore wind farm with 5 turbines in English waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 9 September 2022, not yet built; the record was last updated on 28 April 2022. Its REPD grid reference is 9 km from the nearest postcode on land (NE64 6DP, Northumberland). REPD names the Marine Management Organisation as the consenting authority.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

58.4 MWoffshore wind farm
approved, not builtstatus in REPD
28 April 2022record last updated
9 km from land (Northumberland)REPD location

Consent timeline

DateStage
1 March 2012Application submitted
9 September 2022Consent granted (Marine Management Organisation)

Project details

Technology
offshore wind farm
Capacity
58.4 MW
Turbines
5
Status (REPD)
approved, not built
Record last updated
28 April 2022
Operator or applicant
EDF Energy Renewables
Consenting authority (REPD)
Marine Management Organisation
Application reference
not recorded
Nearest postcode on land
NE64 6DP (Northumberland), 9.1 km from the REPD grid reference
Time to decision
549 weeks
REPD reference
11106

Who decides

REPD names the Marine Management Organisation as the consenting authority.

Postcode districts within 40 km

Districtkm
Newbiggin-by-the-Sea (NE64)9.8
Blyth (NE24)11.3
Ashington (NE63)12.6
Whitley Bay (NE26)14.0
Choppington (NE62)14.6
Bedlington (NE22)14.6
Whitley Bay (NE25)15.0
North Shields (NE30)16.9
Cramlington (NE23)17.0
Newcastle upon Tyne (NE27)17.7
North Shields (NE29)18.4
South Shields (NE33)20.0

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

Other offshore wind projects within 30 km

ProjectMWStatuskm
Blyth Offshore Wind Test Site41.5operational<0.1
Blyth Offshore4decommissioned8.7

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (55.167, -1.3644).