Rhyl Flats offshore wind farm

Rhyl Flats is a 90 MW offshore wind farm with 25 turbines in Welsh waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 28 December 2009; the record was last updated on 23 August 2017. Its REPD grid reference is 9 km from the nearest postcode on land (LL22 8HA, Conwy). It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

90 MWoffshore wind farm
operationalstatus in REPD
23 August 2017record last updated
9 km from land (Conwy)REPD location

Consent timeline

DateStage
25 March 2002Application submitted
1 January 2003Section 36 consent granted (Secretary of State)
1 September 2007Construction started
28 December 2009Operational

Project details

Technology
offshore wind farm
Capacity
90 MW
Turbines
25
Turbine capacity
3.6 MW
Status (REPD)
operational
Record last updated
23 August 2017
Operator or applicant
RWE Npower
Consenting authority (REPD)
DECC (S36)
Application reference
not recorded
Nearest postcode on land
LL22 8HA (Conwy), 9.4 km from the REPD grid reference
Time to decision
40 weeks
REPD reference
2495

Who decides

It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Postcode districts within 40 km

Districtkm
Colwyn Bay (LL29)10.8
Abergele (LL22)12.5
Colwyn Bay (LL28)12.9
Rhyl (LL18)13.2
Llandudno (LL30)13.4
Llandudno Junction (LL31)14.9
Prestatyn (LL19)16.1
Conwy (LL32)18.8
St Asaph (LL17)19.4
Penmaenmawr (LL34)21.7
Denbigh (LL16)25.5
Llanfairfechan (LL33)26.6

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

Other offshore wind projects within 30 km

ProjectMWStatuskm
Gwynt y Mor576operational8.5
North Hoyle60operational13.4
Awel y Mor Offshore Wind Farm775approved, not built14.5
Burbo Bank Extension (Burbo Bank 2)258operational27.0

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (53.3776, -3.6402).