Walney 2 offshore wind farm

Walney 2 is a 184 MW offshore wind farm with 51 turbines in English waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 6 April 2012; the record was last updated on 3 September 2020. Its REPD grid reference is 23 km from the nearest postcode on land (LA14 3XZ, Westmorland and Furness). It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

184 MWoffshore wind farm
operationalstatus in REPD
3 September 2020record last updated
23 km from land (Westmorland and Furness)REPD location

Consent timeline

DateStage
31 March 2006Application submitted
7 November 2007Section 36 consent granted (Secretary of State)
9 April 2011Construction started
6 April 2012Operational

Project details

Technology
offshore wind farm
Capacity
184 MW
Turbines
51
Turbine capacity
3.6 MW
Status (REPD)
operational
Record last updated
3 September 2020
Operator or applicant
Orsted (formerly Dong Energy)
Consenting authority (REPD)
DECC (S36)
Application reference
not recorded
Nearest postcode on land
LA14 3XZ (Westmorland and Furness), 22.6 km from the REPD grid reference
Time to decision
84 weeks
Name in REPD
Walney 2
REPD reference
2506

Who decides

It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Postcode districts within 40 km

Districtkm
Barrow-in-Furness (LA14)25.0
Millom (LA18)26.4
Barrow-in-Furness (LA13)27.1
Millom (LA19)28.2
Askam-in-Furness (LA16)28.9
Dalton-in-Furness (LA15)29.2
Kirkby-in-Furness (LA17)33.3
Ravenglass (CA18)33.6
Broughton-in-Furness (LA20)35.3
Ulverston (LA12)36.8
Holmrook (CA19)37.1
Seascale (CA20)37.9

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

Other offshore wind projects within 30 km

ProjectMWStatuskm
Walney 1184operational7.6
Walney 3659operational8.6
Ormonde Offshore150operational11.1
West of Duddon Sands389operational14.3
Barrow90operational22.6

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (54.0807, -3.609).