Energy Projects Near You

Solar, wind and battery projects near Holmrook (CA19)

3 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of CA19 (Cumberland): 1 approved but not yet running. The largest live scheme is Griffin Park Tactical Training Facility (0.4 MW rooftop solar, approved on 18 February 2025, not yet built), 8.7 km away. Offshore, 3 wind farms are recorded within 40 km; the nearest is Ormonde Offshore (150 MW, operational), 33.3 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

3projects within 10 km
0awaiting a decision
1approved, not running
0operational

Projects within 10 km of CA19

Projects of 1 MW and more (2)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Drigg Wind Clusterwind farmwind farm3refused on appealupdated Jun 2009Jul 1996refused Nov 1996Jun 2009Cumberland4.8
Church House Wind Farmwind farmwind farm4appeal withdrawnupdated Sep 2015Mar 2014—Sep 2015Cumberland7.7
Smaller schemes under 1 MW, mostly rooftop solar (1)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Griffin Park Tactical Training Facilityrooftop solarrooftop solar0.4approved, not builtupdated Mar 2025Oct 2024granted Feb 2025Mar 2025Cumberland8.7

Distance from the average position of the CA19 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Rooftop solar101000.4
Wind farm200010

MW in pipeline: pending, approved and under-construction capacity.

Offshore wind farms within 40 km

Wind farmMWStatus (REPD)km
Ormonde Offshore150operationalupdated Aug 201733.3
Walney 2184operationalupdated Sep 202037.1
Walney 1184operationalupdated Sep 202039.6

Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.

How Cumberland decides solar, wind and battery applications

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

All projects in Cumberland

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Check the council's planning register for the latest decision.