Cromer offshore wind farm

Cromer is a 108 MW offshore wind farm with 30 turbines in English waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 24 March 2010. Its REPD grid reference is 12 km from the nearest postcode on land (NR27 0PR, North Norfolk). It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

108 MWoffshore wind farm
abandonedstatus in REPD
24 March 2010record last updated
12 km from land (North Norfolk)REPD location

Consent timeline

REPD records no consent dates for this project.

Project details

Technology
offshore wind farm
Capacity
108 MW
Turbines
30
Status (REPD)
abandoned
Record last updated
24 March 2010
Operator or applicant
EDF
Consenting authority (REPD)
DECC (S36)
Application reference
not recorded
Nearest postcode on land
NR27 0PR (North Norfolk), 11.8 km from the REPD grid reference
REPD reference
2476

Who decides

It was consented under Section 36 of the Electricity Act 1989 by the Secretary of State for energy (REPD: DECC, the energy department at the time).

Postcode districts within 40 km

Districtkm
Cromer (NR27)13.1
Sheringham (NR26)17.2
North Walsham (NR28)20.7
Norwich (NR11)21.6
Holt (NR25)25.7
Norwich (NR12)27.6
Melton Constable (NR24)30.9
Norwich (NR10)33.0
Great Yarmouth (NR29)37.3
Wells-Next-the-Sea (NR23)39.5
Norwich (NR6)39.8
Norwich (NR8)40.0

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

Other offshore wind projects within 30 km

ProjectMWStatuskm
Sheringham Extension Project317approved, not built23.2
Dudgeon Extension Project402approved, not built23.2
Sheringham Shoal317operational24.1

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (53.0072, 1.4393).