Five Estuaries offshore wind farm

Five Estuaries Wind Farm is a 1,080 MW offshore wind farm with 79 turbines in English waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 17 December 2025, not yet built; the record was last updated on 8 June 2026. REPD gives a grid reference on the coast (IP11 7BQ, East Suffolk), not the position of the turbines, so the distance out to sea is not known from REPD. As a nationally significant project, it was decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN010115).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

1,080 MWoffshore wind farm
approved, not builtstatus in REPD
8 June 2026record last updated
on the coast (East Suffolk)REPD location

Consent timeline

DateStage
25 March 2024Application submitted
17 December 2025Development consent granted (Secretary of State)

Project details

Technology
offshore wind farm
Capacity
1,080 MW
Turbines
79
Turbine capacity
13 MW
Turbine height
370 m
Status (REPD)
approved, not built
Record last updated
8 June 2026
Operator or applicant
RWE Renewables
Consenting authority (REPD)
The Planning Inspectorate - National Infrastructure
Application reference
EN010115
Nearest postcode on land
IP11 7BQ (East Suffolk), <0.1 km from the REPD grid reference
Time to decision
90 weeks
Name in REPD
Five Estuaries - Wind Farm
REPD reference
9803

Official project record at the Planning Inspectorate

Who decides

As a nationally significant project, it was decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN010115). All Energy Secretary decisions on solar and wind farms.

Other offshore wind projects within 30 km

ProjectMWStatuskm
Gunfleet Sands II64.8operational27.3
Gunfleet Sands Offshore Wind Scheme108operational27.5

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (51.9637, 1.3517), which is on the coast rather than at the turbines.