East Anglia 1 North (EA 4) offshore wind farm

East Anglia 1 North (EA 4) is an 800 MW offshore wind farm with 67 turbines in English waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 31 March 2022, not yet built; the record was last updated on 1 April 2022. Its REPD grid reference is 38 km from the nearest postcode on land (IP16 4PB, East Suffolk). As a nationally significant project, it was decided by the Secretary of State responsible for energy at the time on a Development Consent Order after examination by the Planning Inspectorate (EN010077).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

800 MWoffshore wind farm
approved, not builtstatus in REPD
1 April 2022record last updated
38 km from land (East Suffolk)REPD location

Consent timeline

DateStage
15 October 2019Application submitted
31 March 2022Development consent granted (Secretary of State)
31 March 2029Permission due to expire (unless work starts)

Project details

Technology
offshore wind farm
Capacity
800 MW
Turbines
67
Turbine capacity
11.9 MW
Turbine height
282 m
Status (REPD)
approved, not built
Record last updated
1 April 2022
Operator or applicant
Scottish Power Renewables
Consenting authority (REPD)
The Planning Inspectorate - National Infrastructure
Application reference
EN010077
Nearest postcode on land
IP16 4PB (East Suffolk), 38.1 km from the REPD grid reference
Time to decision
128 weeks
REPD reference
2471

Official project record at the Planning Inspectorate

Who decides

As a nationally significant project, it was decided by the Secretary of State responsible for energy at the time on a Development Consent Order after examination by the Planning Inspectorate (EN010077). All Energy Secretary decisions on solar and wind farms.

Postcode districts within 40 km

Districtkm
Aldeburgh (IP15)39.5

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

Other offshore wind projects within 30 km

ProjectMWStatuskm
East Anglia 1 (EA 1)714operational<0.1
East Anglia 3 (EA 3)1,400under construction<0.1
Greater Gabbard Wind Farm504operational29.6
Galloper Wind Farm353operational30.0

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (52.137, 2.1728).