Energy Projects Near You

Solar, wind and battery projects near Aldeburgh (IP15)

2 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of IP15 (East Suffolk): 2 approved but not yet running. The largest live scheme is Dale Farm, Drydale Bottom - Ground Mount Solar Panels (0.2 MW solar farm, approved on 5 May 2023, not yet built; REPD status may be out of date), 9.9 km away. Offshore, 4 wind farms are recorded within 40 km; the nearest is Greater Gabbard Wind Farm (504 MW, operational), 35.0 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

2projects within 10 km
0awaiting a decision
2approved, not running
0operational

Projects within 10 km of IP15

Smaller schemes under 1 MW, mostly rooftop solar (2)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Beach View Holiday Park, Sizewell Common Solar Arrayssolar farmsolar farm—approved, not builtupdated Jun 2026Feb 2026granted Apr 2026Jun 2026East Suffolk5.5
Dale Farm, Drydale Bottom - Ground Mount Solar Panelssolar farmsolar farm0.2approved, not built may be out of dateupdated May 2023Dec 2022granted May 2023May 2023East Suffolk9.9

Distance from the average position of the IP15 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm202000.2

MW in pipeline: pending, approved and under-construction capacity.

Offshore wind farms within 40 km

Wind farmMWStatus (REPD)km
Greater Gabbard Wind Farm504operationalupdated Oct 201935.0
East Anglia 3 (EA 3)1,400under constructionupdated Dec 202539.5
East Anglia 1 North (EA 4)800approved, not builtupdated Apr 202239.5
East Anglia 1 (EA 1)714operationalupdated Aug 202039.5

Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.

How East Suffolk decides solar, wind and battery applications

ApplicationsEast SuffolkUK
Decided applications (solar, wind, battery)5510,236
Refused10 (18%)19%
Solar refused3 of 3812%
Onshore wind refused5 of 845%
Battery storage refused2 of 916%
Median time from submission to decision15.0 weeks17.0 weeks
Appeals lodged / allowed0 / 3—

All projects in East Suffolk

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near IP15, 1 project has a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.