Robin Rigg East offshore wind farm

Robin Rigg East is an 84 MW offshore wind farm with 28 turbines in Scottish waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 28 April 2010; the record was last updated on 18 August 2017. Its REPD grid reference is 12 km from the nearest postcode on land (DG5 4PZ, Dumfries and Galloway). As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

84 MWoffshore wind farm
operationalstatus in REPD
18 August 2017record last updated
12 km from land (Dumfries and Galloway)REPD location

Consent timeline

DateStage
14 June 2002Application submitted
16 June 2003Section 36 consent granted (Scottish Ministers)
1 December 2006Construction started
28 April 2010Operational

Project details

Technology
offshore wind farm
Capacity
84 MW
Turbines
28
Turbine capacity
3 MW
Status (REPD)
operational
Record last updated
18 August 2017
Operator or applicant
E.ON UK
Consenting authority (REPD)
Scottish Government (S36)
Application reference
not recorded
Nearest postcode on land
DG5 4PZ (Dumfries and Galloway), 12.0 km from the REPD grid reference
Time to decision
52 weeks
REPD reference
2496

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Postcode districts within 40 km

Districtkm
Maryport (CA15)14.9
Workington (CA14)17.6
Dalbeattie (DG5)19.0
Cockermouth (CA13)24.0
Kirkcudbright (DG6)24.5
Whitehaven (CA28)25.7
Frizington (CA26)28.0
Cleator Moor (CA25)29.1
Moor Row (CA24)29.3
Wigton (CA7)29.7
Castle Douglas (DG7)30.6
Cleator (CA23)30.6

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

Other offshore wind projects within 30 km

ProjectMWStatuskm
Robin Rigg West90operational2.9

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (54.7642, -3.6955).