Levenmouth demonstration turbine (Fife Energy Park) offshore wind farm

Levenmouth demonstration turbine (Fife Energy Park) is a 7 MW offshore wind farm with 1 turbines in Scottish waters. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 31 March 2014; the record was last updated on 8 November 2018. Its REPD grid reference is 4 km from the nearest postcode on land (KY8 3RS, Fife). As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7 MWoffshore wind farm
operationalstatus in REPD
8 November 2018record last updated
4 km from land (Fife)REPD location

Consent timeline

DateStage
2 December 2009Application submitted
18 November 2011Section 36 consent granted (Scottish Ministers)
8 October 2013Construction started
31 March 2014Operational

Project details

Technology
offshore wind farm
Capacity
7 MW
Turbines
1
Turbine capacity
7 MW (ORE Catapult; REPD: 6 MW)
Status (REPD)
operational
Record last updated
8 November 2018
Operator or applicant
Catapult
Consenting authority (REPD)
Scottish Government (S36)
Application reference
not recorded
Nearest postcode on land
KY8 3RS (Fife), 4.0 km from the REPD grid reference
Time to decision
102 weeks
REPD reference
2528

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Postcode districts within 40 km

Districtkm
Leven (KY8)5.3
Elie (KY9)9.4
Kirkcaldy (KY1)11.6
Glenrothes (KY7)13.1
Kirkcaldy (KY2)14.6
Glenrothes (KY6)15.6
Gullane (EH31)16.1
Cupar (KY15)16.5
Anstruther (KY10)17.7
North Berwick (EH39)18.8
Burntisland (KY3)20.1
Lochgelly (KY5)20.8

Straight-line distance from the centre of each postcode district to the REPD grid reference of the wind farm, which is a single point for the whole site.

Other offshore wind projects within 30 km

ProjectMWStatuskm
Forthwind20approved, not built2.5

All offshore wind farms in UK waters

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database can lag behind consent decisions. Location: REPD grid reference (56.1607, -2.958).