Solar, wind and battery projects near Gullane (EH31)
2 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of EH31 (East Lothian): 1 is waiting for a planning decision, 1 approved but not yet running. The largest live scheme is Haddington Sewage Works, Haddington East (0.2 MW rooftop solar, application submitted on 2 April 2026, no decision recorded), 9.5 km away. Offshore, 2 wind farms are recorded within 40 km; the nearest is Levenmouth demonstration turbine (Fife Energy Park) (7 MW, operational), 16.1 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of EH31
Smaller schemes under 1 MW, mostly rooftop solar (2)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Haddington Sewage Works, Haddington Eastrooftop solar | rooftop solar | 0.2 | application submittedupdated May 2026 | Apr 2026 | — | May 2026 | East Lothian | 9.5 |
| Seton Sands, Holiday Villagerooftop solar | rooftop solar | 0.2 | approved, not built may be out of dateupdated Jul 2023 | May 2023 | granted Jun 2023 | Jul 2023 | East Lothian | 9.6 |
Distance from the average position of the EH31 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Rooftop solar | 2 | 1 | 1 | 0 | 0 | 0.4 |
MW in pipeline: pending, approved and under-construction capacity.
Offshore wind farms within 40 km
| Wind farm | MW | Status (REPD) | km |
|---|---|---|---|
| Levenmouth demonstration turbine (Fife Energy Park) | 7 | operationalupdated Nov 2018 | 16.1 |
| Forthwind | 20 | approved, not builtupdated Aug 2023 | 17.0 |
Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.
How East Lothian decides solar, wind and battery applications
| Applications | East Lothian | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 15 | 10,236 |
| Refused | 1 (7%) | 19% |
| Solar refused | 0 of 6 | 12% |
| Onshore wind refused | 1 of 7 | 45% |
| Battery storage refused | 0 of 2 | 16% |
| Median time from submission to decision | 34.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 1 / 1 | — |
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near EH31, 1 project has a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.