Battery Energy Storage System (200 MW)

Battery Energy Storage System is a 200 MW battery storage project in Spelthorne, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 16 January 2026, not yet built; the record was last updated on 24 February 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

200 MWbattery storage
approved, not builtstatus in REPD
24 February 2026record last updated
Spelthornecouncil area

Planning timeline

DateStage
12 September 2024Application submitted
18 September 2025Refused by the planning authority
16 January 2026Planning permission granted
16 January 2026Appeal allowed
16 January 2029Permission due to expire (unless work starts)

Project details

Technology
battery storage (stand-alone storage)
Capacity
200 MW
Status (REPD)
approved, not built
Record last updated
24 February 2026
Operator or applicant
EcoDev Group Limited
Planning authority
Spelthorne
Planning application reference
24/01112/FUL
Address (REPD)
Ne/O Eco Park, Charlton Lane, Shepperton
Council area (by location)
Spelthorne
Time to decision
70 weeks
Name in REPD
Sunbury Battery Energy Storage System - Battery Energy Storage System
REPD reference
17161

Earlier applications for this site

ApplicationMWSubmittedOutcome
Battery Energy Storage System 24/00017/FUL2004 January 2024withdrawn 19 June 2024

Who decides

Spelthorne has 6 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Long Lane, Stanwellbattery storage49.9approved, not built5.0
Twynersh Meadows, Thorpe Road Solar Park & Battery Storagesolar farm5.5application submitted5.5
London’s Queen Elizabeth II reservoirfloating solar6.3operational9.2
Land south of Holloway Lanesolar farm5application withdrawn9.3
Sipson Roadsolar6.2refused9.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4089, -0.4388).