Energy Projects Near You

Land south of Holloway Lane (5 MW solar farm)

Land south of Holloway Lane is a 5 MW solar farm project in Hillingdon, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 17 December 2015; the record was last updated on 6 January 2016.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
application withdrawnstatus in REPD
6 January 2016record last updated
Hillingdoncouncil area

Planning timeline

DateStage
22 July 2015Application submitted
17 December 2015Application withdrawn

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
application withdrawn
Record last updated
6 January 2016
Operator or applicant
British Solar Renewables
Planning authority
Hillingdon
Planning application reference
1354/APP/2015/2752
Site area
7.8 ha
Address (REPD)
Land south of Holloway Lane, North Harmondsworth Lane, Harmondsworth
Council area (by location)
Hillingdon
REPD reference
5737

Who decides

ApplicationsHillingdonUK
Decided applications (solar, wind, battery)1810,236
Refused1 (6%)19%
Solar refused1 of 1712%
Battery storage refused0 of 116%
Median time from submission to decision7.9 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Sipson Roadsolar6.2refused0.5
Long Lane, Stanwellbattery storage49.9approved, not built4.5
Slough Roadbattery storage57application withdrawn6.0
Battery Energy Storage Systembattery storage200approved, not built9.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4907, -0.4676).