Beaufort Road (20 MW battery storage)

Beaufort Road is a 20 MW battery storage project in Wirral, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: planning permission expired on 4 November 2019; the record was last updated on 28 April 2020.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWbattery storage
permission expiredstatus in REPD
28 April 2020record last updated
Wirralcouncil area

Planning timeline

DateStage
5 September 2016Application submitted
4 November 2019Permission expired

Project details

Technology
battery storage (stand-alone storage)
Capacity
20 MW
Status (REPD)
permission expired
Record last updated
28 April 2020
Operator or applicant
UK Power Reserve
Planning authority
Wirral
Planning application reference
APP/16/01212
Address (REPD)
Land north of, Beaufort Road, Birkenhead, Merseyside
Council area (by location)
Wirral
REPD reference
7128

Who decides

ApplicationsWirralUK
Decided applications (solar, wind, battery)1110,236
Refused0 (0%)19%
Solar refused0 of 912%
Battery storage refused0 of 216%
Median time from submission to decision7.9 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Britannia Housebattery storage10permission expired0.5
Port of Liverpool windwind farm10operational5.9
Hawthorne Roadbattery storage20under construction7.5
Land at Carnegie Roadbattery storage20operational8.2
Liverpool Energy Management Facilitybattery storage49.9operational8.2
Lister Drivebattery storage49.9operational8.2
Carnegie Road (Phase 2)battery storage40permission expired8.2
Battery Energy Storage Systembattery storage6approved, not built8.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.4032, -3.0488).