Energy Projects Near You

Bolt Hall Farm, Lark Hill Road Solar Photovoltaic Farm. (50 MW)

Bolt Hall Farm, Lark Hill Road Solar Photovoltaic Farm. is a 50 MW solar farm project in Rochford, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 23 August 2023, no decision recorded; the record was last updated on 19 February 2026. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

50 MWsolar farm
application submittedmay be out of datestatus in REPD
19 February 2026record last updated
Rochfordcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
23 August 2023Application submitted

Project details

Technology
solar farm
Capacity
50 MW
Status (REPD)
application submitted
Record last updated
19 February 2026
Operator or applicant
Green Switch Capital Limited
Planning authority
Rochford
Planning application reference
23/00733/FUL
Site area
69.6 ha
Address (REPD)
Land At Bolt Hall Farm, Lark Hill Road; Land North Of Ulverston Road; Land Following Canewdon Road And Fambridge Road
Council area (by location)
Rochford
Contracts for Difference
AR7a
Name in REPD
Bolt Hall Farm, Lark Hill Road - Solar Photovoltaic Farm.
REPD reference
11927

Who decides

ApplicationsRochfordUK
Decided applications (solar, wind, battery)1210,236
Refused3 (25%)19%
Solar refused3 of 912%
Battery storage refused0 of 316%
Median time from submission to decision25.0 weeks17.0 weeks
Appeals lodged / allowed1 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Canewdon Road, Canewdon Solar Photovoltaic Farmsolar farm49.9approved, not built1.7
Fambridge Road/Canewdon Roadsolar farm5permission expired2.0
Fambridge Road/Canewdon Roadsolar farm5operational2.0
South Fambridge Hall Solar farm & Battery storagesolar farm50under construction2.7
Wick Farm (Burnham on Crouch)solar farm5operational8.0
Marshes Farmsolar farm25.5approved, not built8.3
Land West Of Flambirds Farmsolar farm5refused9.0
Fairlawns Farm, Chelmsford Roadbattery storage480approved, not built9.1
Great Wheatley Road Solar Farmsolar farm30under construction10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6217, 0.7269).