Carwath Wind Farm (7.5 MW)

Carwath Wind Farm is a 7.5 MW wind farm project in Cumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 13 February 2015; the record was last updated on 9 March 2015.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7.5 MWwind farm
refusedstatus in REPD
9 March 2015record last updated
Cumberlandcouncil area

Planning timeline

DateStage
8 April 2013Application submitted
13 February 2015Refused by the planning authority

Project details

Technology
wind farm
Capacity
7.5 MW
Status (REPD)
refused
Record last updated
9 March 2015
Operator or applicant
West Coast Energy/Carwath Farm Wind Energy Ltd
Planning authority
Cumberland
Planning application reference
2/2013/0227
Turbines
3
Address (REPD)
Carwath, Rosley, Wigton, Cumbria CA7 8BW
Council area (by location)
Cumberland
Time to decision
97 weeks
REPD reference
4273

Who decides

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hilltop Wind Farmwind farm8.8refused6.0
Land between Orton Park Farmsolar farm6.4operational8.3
High Pow Extensionwind farm16application withdrawn9.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.8112, -3.053).