Church Farm, Kingston On Soar Solar Photovoltaic Farm (49.9 MW)

Church Farm, Kingston On Soar Solar Photovoltaic Farm is a 49.9 MW solar farm project in Rushcliffe, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 21 December 2022, not yet built; the record was last updated on 16 February 2026. REPD records the planning permission as expiring on 21 December 2025, but the project holds a Contracts for Difference award (AR7a), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
approved, not builtmay be out of datestatus in REPD
16 February 2026record last updated
Rushcliffecouncil area

REPD records the planning permission as expiring on 21 December 2025, but the project holds a Contracts for Difference award (AR7a), so construction may have started.

Planning timeline

DateStage
29 April 2022Application submitted
21 December 2022Planning permission granted
21 December 2025Permission expired

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
approved, not built
Record last updated
16 February 2026
Operator or applicant
Renewable Connections Developments Limited
Planning authority
Rushcliffe
Planning application reference
22/00809/FUL
Site area
105.0 ha
Address (REPD)
Church Farm Gotham Road Kingston On Soar
Council area (by location)
Rushcliffe
Time to decision
34 weeks
Contracts for Difference
AR7a
Name in REPD
Church Farm, Kingston On Soar - Solar Photovoltaic Farm
REPD reference
9324

Who decides

ApplicationsRushcliffeUK
Decided applications (solar, wind, battery)4310,236
Refused7 (16%)19%
Solar refused4 of 3412%
Battery storage refused3 of 916%
Median time from submission to decision23.1 weeks17.0 weeks
Appeals lodged / allowed2 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Ratcliffe On Soar Power Station Solar Farmsolar farm9approved, not built1.8
Remembrance Waybattery storage99approved, not built2.1
West Leake Lane, Ratcliffebattery storage99.9approved, not built2.8
West Leake Lane, Ratcliffebattery storage1,200approved, not built2.8
Kingston Solar farmsolar farm49.9refused2.9
Lockington Solar Parksolar farm15permission expired4.1
Gothambattery storage100application submitted4.5
Long Whatton Solar Farmsolar farm49.9approved, not built5.8
Barn Farm (Stanford On Soar)solar farm30refused on appeal6.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.846, -1.2536).