Kingston Solar farm (49.9 MW)

Kingston Solar farm is a 49.9 MW solar farm project in Rushcliffe, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 13 March 2023; the record was last updated on 7 March 2022.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
refusedstatus in REPD
7 March 2022record last updated
Rushcliffecouncil area

Planning timeline

DateStage
18 February 2022Application submitted
13 March 2023Refused by the planning authority

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
refused
Record last updated
7 March 2022
Operator or applicant
Renewable Energy System Limited
Planning authority
Rushcliffe
Planning application reference
22/00319/FUL
Site area
80.7 ha
Address (REPD)
Kingston Solar Farm Leake Road Gotham
Council area (by location)
Rushcliffe
Time to decision
55 weeks
REPD reference
8904

Who decides

ApplicationsRushcliffeUK
Decided applications (solar, wind, battery)4310,236
Refused7 (16%)19%
Solar refused4 of 3412%
Battery storage refused3 of 916%
Median time from submission to decision23.1 weeks17.0 weeks
Appeals lodged / allowed2 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Gothambattery storage100application submitted1.8
Ratcliffe On Soar Power Station Solar Farmsolar farm9approved, not built2.7
Church Farm, Kingston On Soar Solar Photovoltaic Farmsolar farm49.9approved, not built2.9
West Leake Lane, Ratcliffebattery storage99.9approved, not built2.9
West Leake Lane, Ratcliffebattery storage1,200approved, not built2.9
Remembrance Waybattery storage99approved, not built4.6
Fair Oaks Renewable Energy Park Solar farm & Battery energy storagesolar farm49.9approved, not built4.7
Lockington Solar Parksolar farm15permission expired5.6
Highfields Farm Solar Farm & Battery Storagesolar farm42.9approved, not built6.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.8602, -1.2183).