Ratcliffe On Soar Power Station Solar Farm (9 MW)
Ratcliffe On Soar Power Station Solar Farm is a 9 MW solar farm project in Rushcliffe, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 19 July 2023, not yet built; the record was last updated on 4 August 2023.
9 MWsolar farm
approved, not builtstatus in REPD
4 August 2023record last updated
Rushcliffecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 21 July 2022 | Application submitted |
| 19 July 2023 | Planning permission granted |
Project details
- Technology
- solar farm
- Capacity
- 9 MW
- Status (REPD)
- approved, not built
- Record last updated
- 4 August 2023
- Operator or applicant
- Rushcliffe Borough Council
- Planning authority
- Rushcliffe
- Planning application reference
- 22/01339/LDO
- Address (REPD)
- Ratcliffe On Soar Power Station, Green Street, Nottingham
- Council area (by location)
- Rushcliffe
- Time to decision
- 52 weeks
- Name in REPD
- Ratcliffe On Soar Power Station - Solar Farm
- REPD reference
- 14507
Who decides
| Applications | Rushcliffe | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 43 | 10,236 |
| Refused | 7 (16%) | 19% |
| Solar refused | 4 of 34 | 12% |
| Battery storage refused | 3 of 9 | 16% |
| Median time from submission to decision | 23.1 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 4 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Church Farm, Kingston On Soar Solar Photovoltaic Farm | solar farm | 49.9 | approved, not built | 1.8 |
| Remembrance Way | battery storage | 99 | approved, not built | 2.3 |
| Kingston Solar farm | solar farm | 49.9 | refused | 2.7 |
| Lockington Solar Park | solar farm | 15 | permission expired | 2.9 |
| Gotham | battery storage | 100 | application submitted | 4.0 |
| West Leake Lane, Ratcliffe | battery storage | 99.9 | approved, not built | 4.2 |
| West Leake Lane, Ratcliffe | battery storage | 1,200 | approved, not built | 4.2 |
| East Midlands Distribution Centre | rooftop solar | 6.1 | operational | 6.7 |
| Fair Oaks Renewable Energy Park Solar farm & Battery energy storage | solar farm | 49.9 | approved, not built | 7.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.8618, -1.2591).