Craigenlee Wind Farm (7.8 MW)

Craigenlee Wind Farm is a 7.8 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 25 September 2014; the record was last updated on 25 September 2014.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7.8 MWwind farm
application withdrawnstatus in REPD
25 September 2014record last updated
Dumfries and Gallowaycouncil area

Planning timeline

DateStage
6 June 1997Application submitted
25 September 2014Application withdrawn

Project details

Technology
wind farm
Capacity
7.8 MW
Status (REPD)
application withdrawn
Record last updated
25 September 2014
Operator or applicant
RWE npower
Planning authority
Dumfries and Galloway
Planning application reference
not recorded
Turbines
14
Address (REPD)
Craigenlee Fell / Broad Moor , Dumfries and Galloway
Council area (by location)
Dumfries and Galloway
REPD reference
4528

Who decides

ApplicationsDumfries and GallowayUK
Decided applications (solar, wind, battery)10610,236
Refused40 (38%)19%
Solar refused1 of 1812%
Onshore wind refused33 of 7245%
Battery storage refused6 of 1616%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed19 / 17—

Other large projects within 10 km

ProjectTypeMWStatuskm
North Rhinswind farm22operational1.0
Wind Farm at 14km E/O Craig Nab Wind Energy Hubwind farm33application submitted5.5
Larbrax Wind Farmbattery storage10application submitted5.5
Larbrax Wind Farmwind farm19.2application submitted5.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.8685, -5.0871).