Wind Farm at 14km E/O Craig Nab Wind Energy Hub (33 MW)

Wind Farm at 14km E/O Craig Nab Wind Energy Hub is a 33 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 20 December 2024, no decision recorded; the record was last updated on 17 January 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

33 MWwind farm
application submittedstatus in REPD
17 January 2025record last updated
Dumfries and Gallowaycouncil area

Planning timeline

DateStage
20 December 2024Application submitted

Project details

Technology
wind farm
Capacity
33 MW
Status (REPD)
application submitted
Record last updated
17 January 2025
Operator or applicant
Belltown Power Limited
Planning authority
Dumfries and Galloway
Planning application reference
24/2545/FUL
Turbines
5
Turbine height
230 m
Address (REPD)
14km E/O Craig Nab Wind Energy Hub, Stranraer
Council area (by location)
Dumfries and Galloway
Name in REPD
Craig Nab Wind Energy Hub - Wind Farm
REPD reference
12766

The scheme also includes 3.8 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsDumfries and GallowayUK
Decided applications (solar, wind, battery)10610,236
Refused40 (38%)19%
Solar refused1 of 1812%
Onshore wind refused33 of 7245%
Battery storage refused6 of 1616%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed19 / 17—

Other large projects within 10 km

ProjectTypeMWStatuskm
Larbrax Wind Farmwind farm19.2application submitted<0.1
Larbrax Wind Farmbattery storage10application submitted<0.1
North Rhinswind farm22operational4.9
Craigenlee Wind Farmwind farm7.8application withdrawn5.5
Mid Moile Wind Farmwind farm99.4approved, not built9.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.9036, -5.0276).