Fair Oak Lane (49.9 MW battery storage)

Fair Oak Lane is a 49.9 MW battery storage project in Kingston upon Thames, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 14 June 2019; the record was last updated on 27 June 2019.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWbattery storage
refused on appealstatus in REPD
27 June 2019record last updated
Kingston upon Thamescouncil area

Planning timeline

DateStage
31 October 2017Application submitted
14 February 2019Appeal lodged
14 June 2019Appeal refused

Project details

Technology
battery storage (stand-alone storage)
Capacity
49.9 MW
Status (REPD)
refused on appeal
Record last updated
27 June 2019
Operator or applicant
Renewable Energy Systems
Planning authority
Kingston upon Thames
Planning application reference
17/10404
Appeal reference
APP/Z5630/W/18/3205282
Address (REPD)
Land opposite Chessington Subs, Fair Oak Lane, Kingston-On-Thames
Council area (by location)
Kingston upon Thames
REPD reference
7091

Who decides

Kingston upon Thames has 3 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Barnett Wood Lanebattery storage98approved, not built3.6
Cobham Road, Bookham Solar Farmsolar farm49.5approved, not built5.3
London’s Queen Elizabeth II reservoirfloating solar6.3operational5.4
Rushett Lanebattery storage30approved, not built6.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.3415, -0.3204).