Fosse Green Energy (350 MW solar farm)

Fosse Green Energy is a 350 MW solar farm project in North Kesteven, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 18 July 2025, no decision recorded; the record was last updated on 13 October 2025. As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN010154).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

350 MWsolar farm
application submittedstatus in REPD
13 October 2025record last updated
North Kestevencouncil area

Planning timeline

DateStage
18 July 2025Application submitted

Project details

Technology
solar farm
Capacity
350 MW
Status (REPD)
application submitted
Record last updated
13 October 2025
Operator or applicant
Windel Energy / Canadian Solar
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
EN010154
Site area
1,071.0 ha
Address (REPD)
9km SW/O Lincoln, Lincoln
Council area (by location)
North Kesteven
REPD reference
14100

The scheme also includes battery storage, recorded separately in REPD (application submitted).

Official project record at the Planning Inspectorate (EN010154)

Who decides

As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN010154). All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Whisby Quarry, Eagle Roadfloating solar18approved, not built4.9
Hill Rise, Colebybattery storage1,000application submitted7.2
Green Man Road, Navenbybattery storage400application submitted9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1517, -0.648).