Garbet Windfarm Wind Farm & Storage facility (46.2 MW)

Garbet Windfarm Wind Farm & Storage facility is a 46.2 MW wind farm project in Moray, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction since 1 March 2025; the record was last updated on 8 July 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

46.2 MWwind farm
under constructionstatus in REPD
8 July 2025record last updated
Moraycouncil area

Planning timeline

DateStage
11 January 2021Application submitted
26 November 2021Planning permission granted
1 December 2021Appeal lodged
26 September 2022Appeal allowed
1 March 2025Construction started

Project details

Technology
wind farm
Capacity
46.2 MW
Status (REPD)
under construction
Record last updated
8 July 2025
Operator or applicant
Energiekontor UK Limited / Uniper
Planning authority
Moray
Planning application reference
21/00020/EIA
Turbines
8
Turbine height
200 m
Address (REPD)
SE/O Dufftown Keith Grampian
Council area (by location)
Moray
Time to decision
46 weeks
Contracts for Difference
AR5
Name in REPD
Garbet Windfarm - Wind Farm & Storage facility
REPD reference
8468

The scheme also includes 3 MW of battery storage, recorded separately in REPD (under construction).

Who decides

ApplicationsMorayUK
Decided applications (solar, wind, battery)2110,236
Refused7 (33%)19%
Solar refused0 of 212%
Onshore wind refused7 of 1445%
Battery storage refused0 of 516%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed4 / 6—

Other large projects within 10 km

ProjectTypeMWStatuskm
Craig Watch Wind Farm & Battery Storagewind farm72.6application submitted<0.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.4458, -3.1296).