Hacche Barton Solar Farm (9.2 MW)

Hacche Barton Solar Farm is a 9.2 MW solar farm project in North Devon, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 4 July 2013; the record was last updated on 4 July 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

9.2 MWsolar farm
application withdrawnstatus in REPD
4 July 2013record last updated
North Devoncouncil area

Planning timeline

DateStage
23 July 2012Application submitted
4 July 2013Application withdrawn

Project details

Technology
solar farm
Capacity
9.2 MW
Status (REPD)
application withdrawn
Record last updated
4 July 2013
Operator or applicant
Lumicity
Planning authority
North Devon
Planning application reference
54387
Site area
18.4 ha
Address (REPD)
Hacche Barton, South Molton, Devon
Council area (by location)
North Devon
REPD reference
1625

Who decides

ApplicationsNorth DevonUK
Decided applications (solar, wind, battery)3710,236
Refused9 (24%)19%
Solar refused4 of 2612%
Onshore wind refused5 of 645%
Battery storage refused0 of 516%
Median time from submission to decision23.3 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Kingsland Barton Solar Farmsolar farm5operational2.7
Three Moors Wind Farmwind farm22refused on appeal8.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.0349, -3.8368).