Harestanes South Windfarm Extension (45 MW)

Harestanes South Windfarm Extension is a 45 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 7 December 2020, no decision recorded; the record was last updated on 6 April 2022. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

45 MWwind farm
application submittedmay be out of datestatus in REPD
6 April 2022record last updated
Dumfries and Gallowaycouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
7 December 2020Application submitted

Project details

Technology
wind farm
Capacity
45 MW
Status (REPD)
application submitted
Record last updated
6 April 2022
Operator or applicant
ScottishPower Renewables
Planning authority
Scottish Government (S36)
Planning application reference
ECU00002185
Turbines
8
Turbine height
200 m
Address (REPD)
Harestanes Windfarm, Forest Of Ae, Northwest Of Ae Village, Moffat, Dumfries and Galloway
Council area (by location)
Dumfries and Galloway
REPD reference
7868

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Kellwood Roadbattery storage40approved, not built1.1
Land At Hartwood Hillwind farm21application withdrawn9.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.0698, -3.6093).