High Wood Wind Farm (25 MW)
High Wood Wind Farm is a 25 MW wind farm project in East Riding of Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 3 August 2015; the record was last updated on 2 September 2015.
25 MWwind farm
application withdrawnstatus in REPD
2 September 2015record last updated
East Riding of Yorkshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 2 February 2015 | Application submitted |
| 3 August 2015 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 25 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 2 September 2015
- Operator or applicant
- EDF Energy Renewables
- Planning authority
- East Riding of Yorkshire
- Planning application reference
- 15/00315/STPLFE
- Turbines
- 10
- Turbine height
- 127 m
- Address (REPD)
- High Wood Wind Farm, Dalton, Driffield, Humberside
- Council area (by location)
- East Riding of Yorkshire
- REPD reference
- 3634
Who decides
| Applications | East Riding of Yorkshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 143 | 10,236 |
| Refused | 26 (18%) | 19% |
| Solar refused | 1 of 59 | 12% |
| Onshore wind refused | 24 of 63 | 45% |
| Battery storage refused | 1 of 21 | 16% |
| Median time from submission to decision | 18.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 4 / 10 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Sunderlandwick Solar Farm | solar farm | 49.9 | approved, not built | 8.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.9737, -0.5622).